Case Summary | | | 3/23/2007 | | |
|
|
|
|
INSP-Final Inspection | 11/13/2006 | 11/14/2006 | 11/14/2006 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 10/24/2006 | 10/24/2006 | 10/24/2006 | P | PART |
Troy Cobbley
|
|
|
I gave the sprinkler contractor permission to cover the sprinkler piping but there are several outstanding issues still. No approved plans were on site so I could not verify if the corrected head spacing was alright. Also 8.0 K factor heads have been installed. I requested verification that the existing sprinkler system could support these heads. The fitter stated that Randy Knutson had already done this investigating. The annual inspection tag has not been updated at the riser.
|
INSP-Final Inspection | 10/13/2006 | 10/13/2006 | 10/13/2006 | P | CANC |
Forrest France
|
|
|
Can we get this late in the day. Richard is the contact ####-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Trent Bice Inspection cancelled from web by: Trent Bice
|
INSP-Final Inspection | 10/11/2006 | 10/12/2006 | 10/12/2006 | A | FAIL |
Forrest France
|
|
|
Pendent sprinkler heads in the showroom area are mixed response and k factor, some heads are overspaced, need to provide a current annual inspection for the existing riser prior to final.
|
Pending Assignment by SAM | 9/27/2006 | | 9/28/2006 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/28/2006 | | 9/28/2006 | | PASS |
|
|
|
Plans approved as noted. No seperate review comments are attached to plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/28/2006 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/28/2006 | | 9/28/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/28/2006 | | DONE |
|
|
|
spoke to lilly@###-####/told permit was ready, project name, and fee
|
Issue and Print Permit | | | 9/28/2006 | | DONE |
|
|
|
|
Application received | | | 9/27/2006 | | |
|
|
|
|