INSP-Final Inspection | 2/8/2008 | 2/11/2008 | 2/11/2008 | A | PASS |
Forrest France
|
|
|
Fire sprinkler system final testing passed, previous correction items are complete, plan resubmittals provided, three defficiencies noted at today's inspection repaired while on site, dry system trip test and DCVA forward flow testing passed. See project related permit FIR06-00727 for the balance of activities and inspections completed for this overhead work listed under the UG permit due to contractor mixing permit #'s for site inspeciton requests.
|
Plan assigned to (SAM) | 1/28/2008 | | 2/8/2008 | | PASS |
Cathy Brown
|
|
|
2/8/2008 14:34:58 CMB - activity updated through activity FIRA22 from case FIR07-00243.
|
Telephone call | | | 2/8/2008 | | DONE |
|
|
|
Telcon from Clarence, regarding status. I confirmed they are still in process, the 10-day normal turnaround for plan modifications will be Monday. Called Brian J, left voice message to call Clarence directly with status. I confirmed he can schedule inspection same day permit is re-issued; can get inspection same day if received before noon; or next morning if received afternoon. I also spoke with Forrest; he's overbooked today but will give this inspection priority as soon as it gets scheduled.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/8/2008 | | |
|
|
|
|
Inspection Record Card- Fire | 2/8/2008 | | 2/8/2008 | | DONE |
Cathy Brown
|
|
|
|
Permit Ready to Issue | | | 2/8/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/8/2008 | | |
|
|
|
|
Sprinkler Plan Check | 1/28/2008 | | 2/7/2008 | | PASS |
|
|
|
This review was the 4th, of this review 26 additional heads were affected. *As-Built Plans are Approved by Bryan Johnson
|
INSP-Final Inspection | 1/24/2008 | 1/28/2008 | 1/28/2008 | P | FAIL |
Forrest France
|
|
|
Need plan resubmittals per field inspection notes completed 6/27/07 for the dry system modifications, the paddle style waterflow switch at the dry system riser is not allowed, provide a QR head at the first floor SE storage room, need to provide a seal or lock at the ball valve to the pressure switch at the dry system trim, noted mixed response heads at three rooms on the second floor including 212 and 223, one head at room 236 is obstructed by a light fixture, noted items from the previous inspection at the 1st floor are complete, inspection concluded at this time due to time constraints.
|
Plan resubmittals received | | | 1/28/2008 | | |
|
|
|
Plan Modification: Received three copies of as-built drawings and application
|
INSP-Sprinkler Rough-in | 1/14/2008 | 1/18/2008 | 1/18/2008 | A | PART |
Forrest France
|
|
|
First floor corridor fire sprinklers are okay for cover with the exception of two pendents in need of relocation due to overspacing from adjacent vestibules to the meeting room, also noted one head blocked by a 4' soffit at the lobby, missing head at the laundry chute termination room, discussed head location at a mech. room, the elevator pit head is not yet installed, missing escutcheons at some locations.
|
Telephone call | | | 1/14/2008 | | DONE |
|
|
|
Received package from Delta Fire for project FIR07-00243, the plans are marked As-Built. Called Forrest to find out if he asked for the As-Built plans to be submitted to Boise City and if these plans are resubmittal review plans or just as-built, Forrest was not aware of what these plans were for. Called Delta Fire Office talked to Ron Holmgren asked Ron if these plans were for resubmittal or As-Built, Ron said they were As-Built. I told him I would take the plans to the front desk for Delta to pickup and have ready for field inspection.
|
INSP-Sprinkler Rough-in/Hydro | 8/9/2007 | 8/10/2007 | 8/10/2007 | A | PART |
Forrest France
|
|
|
Heads at the laundry chute are okay for cover, noted one hanger at the 2nd floor piping to the chute in need of attatchment.
|
Issue and Print Permit | | | 6/5/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/4/2007 | | 6/4/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/4/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/4/2007 | | DONE |
|
|
|
tlk to michael mead ###-#### that permit and no fee ready to be picked up
|
Permit Ready to Issue | | | 6/4/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 5/16/2007 | | 5/31/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
Issue and Print Permit | | | 4/4/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/3/2007 | | 4/3/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 3/16/2007 | | 4/3/2007 | | PASS |
|
|
|
Plans are approved with Conditions for Wet Pipe by Bryan Johnson
|
Telephone call | | | 4/3/2007 | | |
|
|
|
lft vm with michael mead ###-#### that permit is ready to be picked up
|
Permit Ready to Issue | | | 4/3/2007 | | DONE |
|
|
|
|
Application received | | | 3/16/2007 | | |
|
|
|
|
Pending Assignment by SAM | 3/16/2007 | | | | |
|
|
|
|