INSP-Final Inspection | 5/18/2007 | 5/18/2007 | 5/18/2007 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 5/3/2007 | 5/4/2007 | 5/4/2007 | A | PASS |
Troy Cobbley
|
|
|
Hydro test for the new system passed. A cracked fitting was to blame.
|
INSP-Sprinkler Rough-in/Hydro | 5/2/2007 | 5/3/2007 | 5/3/2007 | A | FAIL |
Troy Cobbley
|
|
|
the guage did not hold pressure
|
Issue and Print Permit | | | 4/25/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 4/6/2007 | | 4/18/2007 | | PASS |
|
|
|
Plans are approved by Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/18/2007 | | 4/18/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2007 | | DONE |
|
|
|
tlk to tom dutkus ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 4/18/2007 | | DONE |
|
|
|
|
Case Summary | | | 4/6/2007 | | DONE |
|
|
|
|
Application received | | | 4/6/2007 | | |
|
|
|
|
Pending Assignment by SAM | 4/6/2007 | | | | |
|
|
|
|