INSP-Final Inspection | 12/18/2008 | 12/18/2008 | 12/18/2008 | P | PASS |
Forrest France
|
|
|
Scope of work indicated per documents completed, permit finaled.
|
INSP-Sprinkler Rough-in | 7/30/2007 | 7/31/2007 | 8/1/2007 | A | FAIL |
Forrest France
|
|
|
See stamped plans for areas inspected and approved, circled locations for heads in need of replacement, obstructed or overspaced as noted.
|
INSP-Sprinkler Rough-in/Hydro | 7/20/2007 | 7/23/2007 | 7/23/2007 | A | PART |
Forrest France
|
|
|
Defficiencies noted at the previous inspection are repaired, noted on stamped plan set areas okay for cover, discussed project scheduling.
|
INSP-Sprinkler Rough-in | 7/18/2007 | 7/20/2007 | 7/20/2007 | A | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the locations where the sprinkler piping can be covered. I found one pipe in the restroom appears to be leaking. I pointed this out to dave the fitter.
|
Application received | | | 4/24/2007 | | |
|
|
|
|
Sprinkler Plan Check | 4/24/2007 | | 4/24/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/24/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/24/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 4/24/2007 | | 4/24/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/24/2007 | | DONE |
|
|
|
left message with Brittney permit ready for pu fee 150.00
|
Issue and Print Permit | | | 4/24/2007 | | DONE |
|
|
|
|
Pending Assignment by SAM | 4/24/2007 | | | | |
|
|
|
|