INSP-Final Inspection | 4/24/2008 | 4/25/2008 | 4/25/2008 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit approved for final per inspection notes completed 7/27/07, doc. finaled.
|
INSP-Sprinkler Rough-in/Hydro | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | PASS |
Forrest France
|
|
|
OH install passed final inspection.
|
INSP-Sprinkler Rough-in/Hydro | 7/19/2007 | 7/23/2007 | 7/23/2007 | A | FAIL |
Forrest France
|
|
|
Hydrostatic test failed due to start pressure below 200 psi, rooms added to the original TI area shall be shown on resubmittals, one overspaced head noted at the exit corridor SW corner, field modifications for the exit corridor fire sprinklers to be shown on as-built plans.
|
INSP-Sprinkler Rough-in/Hydro | 7/5/2007 | 7/9/2007 | 7/9/2007 | A | PART |
Forrest France
|
|
|
OH rough-in and the hydrostatic test completed acceptable.
|
INSP-Sprinkler Rough-in/Hydro | 7/3/2007 | 7/6/2007 | 7/5/2007 | A | DEFR |
Forrest France
|
|
|
Scheduled by a contractor via Hello! on 7/3/2007 at 1:36:18 PM. Contact: ###-####.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/3/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/3/2007 | | 7/3/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/3/2007 | | DONE |
|
|
|
lft vm with tom householder ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 7/3/2007 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/3/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 6/12/2007 | | 7/1/2007 | | PASS |
|
|
|
Plans are approved as Submitted by Bryan Johnson
|
Case Summary | | | 6/18/2007 | | DONE |
|
|
|
|
Application received | | | 6/12/2007 | | |
|
|
|
|
Pending Assignment by SAM | 6/12/2007 | | | | |
|
|
|
|