INSP-Final Inspection | 1/14/2008 | 1/15/2008 | 1/15/2008 | A | PASS |
Forrest France
|
|
|
Correction notice items verified for compliance, final fire sprinkler inspection passed, permit finaled.
|
INSP-Final Inspection | 1/14/2008 | 1/14/2008 | 1/14/2008 | P | FAIL |
Forrest France
|
|
|
Visible leakage noted at the riser main control valve, missing one DSW head at the garage, one pendent head at the foyer is not installed, two heads at a hallway are overspaced, inspection concluded at this time due to the number of defficient items found at the start, project is not ready for final at this time.
|
INSP-Final Inspection | 1/10/2008 | 1/11/2008 | 1/11/2008 | A | CANC |
Forrest France
|
|
|
Overbooked.
|
INSP-Supply line flush | 1/8/2008 | 1/8/2008 | 1/8/2008 | P | PART |
Forrest France
|
|
|
UG supply line flush completed.
|
INSP-Sprinkler Rough-in | 9/14/2007 | 9/14/2007 | 9/14/2007 | P | PART |
Forrest France
|
|
|
AG install is approved for cover, riser is not yet complete, be aware of possible light fixture obstructions.
|
INSP-Sprinkler Rough-in/Hydro | 9/11/2007 | 9/12/2007 | 9/14/2007 | A | DEFR |
Forrest France
|
|
|
Scheduled for 9/13.
|
INSP-Sprinkler Rough-in | 9/11/2007 | 9/11/2007 | 9/11/2007 | P | CANC |
Forrest France
|
|
|
Inspection rescheduled.
|
Issue and Print Permit | | | 8/30/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/28/2007 | | 8/28/2007 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/28/2007 | | DONE |
|
|
|
|
Telephone call | | | 8/28/2007 | | DONE |
|
|
|
t/c w jon edes at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 8/28/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/8/2007 | | 8/27/2007 | | PASS |
|
|
|
plans are approved as submitted by bryan johnson
|
Application received | | | 8/8/2007 | | |
|
|
|
|
Pending Assignment by SAM | 8/8/2007 | | | | |
|
|
|
|