INSP-Final Inspection | 1/14/2008 | 1/14/2008 | 1/14/2008 | P | PASS |
Forrest France
|
|
|
Corrections verified for compliance, fire sprinkler permit finaled.
|
INSP-Final Inspection | 1/11/2008 | 1/11/2008 | 1/11/2008 | P | CANC |
Forrest France
|
|
|
Overbooked.
|
INSP-Sprinkler Rough-in/Hydro | 1/3/2008 | 1/4/2008 | 1/4/2008 | A | PART |
Forrest France
|
|
|
OH hydrostatic testing passed, also inspected overhead rough-in and noted some issues including missing flex couplings at the riser, need bags at the heads in the paint and spray booths, provide retaining straps at the beam clamps, need to certify DCVA, noted 286 deg. heads have been installed in lieu of 200 deg. as indicated on plans, the two DSW heads at the exhaust ducts are not yet installed.
|
INSP-Sprinkler Rough-in | 12/26/2007 | 12/27/2007 | 12/27/2007 | A | PART |
Forrest France
|
|
|
On site conference regarding head spacing at one spray booth to avoid cold soldering, no other items reviewed or inspected today.
|
Issue and Print Permit | | | 12/26/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2007 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/19/2007 | | 12/19/2007 | | DONE |
|
|
|
|
Telephone call | | | 12/19/2007 | | DONE |
|
|
|
tlk to gerald ebeling ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 12/19/2007 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/26/2007 | | 12/18/2007 | | PASS |
|
|
|
Plans approved by Bryan Johnson
|
Case Summary | | | 11/26/2007 | | DONE |
|
|
|
|
Application received | | | 11/26/2007 | | |
|
|
|
|
Pending Assignment by SAM | 11/26/2007 | | | | |
|
|
|
|