Miscellaneous action | | | 3/11/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 1/28/2009 | 1/29/2009 | 1/29/2009 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 1/28/2009 | 1/28/2009 | 1/28/2009 | P | PASS |
Troy Cobbley
|
|
|
The underground and overhead hydro tests passed.
|
INSP-Sprinkler Rough-in/Hydro | 1/26/2009 | 1/26/2009 | 1/27/2009 | P | PASS |
Troy Cobbley
|
|
|
The remaining ceilings covering the sprinkler piping are ok to install
|
INSP-Sprinkler Rough-in/Hydro | 1/21/2009 | 1/21/2009 | 1/22/2009 | P | PART |
Troy Cobbley
|
|
|
UG supply hydro failed. UG fdc hydro passed.
|
INSP-Sprinkler Rough-in | 1/20/2009 | 1/20/2009 | 1/20/2009 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the rooms where sprinkler piping can be covered.
|
Override - Parcel Holds | 1/20/2009 | 1/1/1900 | 1/20/2009 | | |
|
|
|
fire sprinkler piping only
|
INSP-Sprinkler Rough-in/Hydro | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for the Storage area that the sprinkler piping is ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 1/13/2009 | 1/13/2009 | 1/13/2009 | P | PASS |
Troy Cobbley
|
|
|
See the city approved plans for areas that are ok to cover
|
INSP-Sprinkler Rough-in/Hydro | 1/6/2009 | 1/6/2009 | 1/6/2009 | P | PASS |
Troy Cobbley
|
|
|
Hard Lids over the south restrooms are ok to install. The supply line for the FDC flushed passed.
|
Issue and Print Permit | | | 1/6/2009 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/5/2009 | | 1/5/2009 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2009 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 1/5/2009 | | 1/5/2009 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 1/5/2009 | | DONE |
Cathy Brown
|
|
|
tlk to randy ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/5/2009 | | DONE |
Cathy Brown
|
|
|
|
Plan resubmittals received | | | 12/31/2008 | | |
Sam Rogers
|
|
|
Plan mod rec'd- 5 copies of app, and plans; taken to fire review
|
INSP-Sprinkler Rough-in/Hydro | 12/30/2008 | 12/30/2008 | 12/30/2008 | P | PASS |
Troy Cobbley
|
|
|
The mens and womens locker rooms located along the north wall are ok to cover.
|
INSP-Sprinkler Rough-in/Hydro | 12/29/2008 | 12/29/2008 | 12/29/2008 | P | PART |
Troy Cobbley
|
|
|
The rough-in inspection for the 3" and 2 1/2" mains and 1 1/4" branchline piping passed. Pendant head locations have not been inspected at this time. Per the fitter plans are being resubmitted for pendant head location changes due to revised wall layout. I noted sprinkler coverage missing in four shower areas.
|
INSP-Sprinkler Rough-in/Hydro | 12/23/2008 | 12/26/2008 | 12/26/2008 | P | DEFR |
Forrest France
|
|
|
Rough In Inspection - Contact: Todd K Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley
|
INSP-Supply line flush | 12/5/2008 | 12/8/2008 | 12/8/2008 | A | PART |
Troy Cobbley
|
|
|
The flush for the underground supply line passed but the supply line for the remote FDC has not been flushed as required.
|
INSP-Sprinkler Rough-in | 10/1/2008 | 10/1/2008 | 10/1/2008 | P | PASS |
Troy Cobbley
|
|
|
The remaining underground piping is ok to cover.
|
INSP-Sprinkler Rough-in | 9/30/2008 | 9/30/2008 | 9/30/2008 | P | PART |
Troy Cobbley
|
|
|
The undergournd supply piping and the remote FDC piping is ok to cover except for either end since thrust blocks and vaults had not been installed yet. The PIV is being installed rather close to the parking lot curbing. I spoke to Dave Hanniman and did a on site visit. At this stage of the installation it does not look like the PIV will be in danger of being struck by a vehicle which is daves concern. Randy Bowron spoke to Chris Palmer with ESI about the concerns with the actual placement of the curbing and where it needs to be.
|
INSP-Sprinkler Rough-in/Hydro | 9/29/2008 | 9/29/2008 | 9/29/2008 | P | CANC |
Troy Cobbley
|
|
|
To be rescheduled per Todd.
|
Sprinkler Plan Check | 9/24/2008 | | 9/25/2008 | | PASS |
|
|
|
Plans approved with outstanding requirements for the provision of the Owners Certificate. Plans are approved w/Pending requirements per Bryan Johnson
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2008 | | DONE |
Cathy Brown
|
|
|
|
Inspection Record Card- Fire | 9/25/2008 | | 9/25/2008 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 9/25/2008 | | DONE |
Cathy Brown
|
|
|
tlk to gerald ebeling ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 9/25/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 9/25/2008 | | |
|
|
|
|
Plan resubmittals received | | | 9/24/2008 | | |
Scott Arellano
|
|
|
received "5" copies of plans with app for each set- put plans on fire shelf
|
Sprinkler Plan Check | 9/9/2008 | | 9/23/2008 | | FAIL |
|
|
|
These plans were denied due to missing or incorrect information. Upon request, the denied set of plans may be retrieved from my office for salvage. The denied set of plans will be maintained for 5 work days.
|
Application received | | | 9/9/2008 | | |
|
|
|
|
Pending Assignment by SAM | 9/9/2008 | | 9/9/2008 | | |
|
|
|
|
Plan assigned to (SAM) | 12/31/2008 | | | | |
Sam Rogers
|
|
|
|