Miscellaneous action | | | 5/11/2009 | | DONE |
|
|
|
Plans taken to records to scan
|
INSP-Final Inspection | 2/12/2009 | 2/13/2009 | 2/13/2009 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled. The recall function of the machine room smoke and heat detectors was modified while on site for correct function. The duct smoke detectors were factory installed and tested ok. A larger more legible map is to be installed at the remote annunciator.
|
INSP-Final Inspection | 2/5/2009 | 2/6/2009 | 2/6/2009 | A | FAIL |
Troy Cobbley
|
|
|
Per Scotty the project is not ready for inspection.
|
INSP-Final Inspection | 2/2/2009 | 2/3/2009 | 2/3/2009 | A | FAIL |
Troy Cobbley
|
|
|
Provide print out of todays signal report, test the duct smoke detectors, provide verification of review comment #20, provide verification of sprinkler coverage at the top of the elevator shaft, provide automatic disconnect and monitoring of the 120 volt power as per review note #6, provide firemans hat functions, recall and shunt trip functions as per 6.16.3, provide as builts showing the additional devices, relocate the smoke and heat detectors to the deck, repair the PIV tamper switch.
|
Telephone call | | | 1/23/2009 | | DONE |
|
|
|
Spoke with Scotty w/ADT regarding the manual pull station. Approved plan location is now going to have several obstructions. He asked if the device could be relocated to the nearest emergency exit instead. Since this is a fully sprinklered building, only one pull station is needed for the sprinkler system. Optimal location would be the riser room, however it is a separate room with no access to the rest of the building. Therefore I told Scotty his proposed location is fine but subject to field approval (i.e. obstructions, mounting height, etc...).
|
Inspection Record Card- Fire | 12/11/2008 | | 12/11/2008 | | DONE |
|
|
|
|
Telephone call | | | 12/11/2008 | | DONE |
|
|
|
left vm for dave whiting at ###-#### - permit ready and no fees due
|
Permit Ready to Issue | | | 12/11/2008 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/11/2008 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 12/10/2008 | | 12/10/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | | | 12/10/2008 | | PASS |
|
|
|
See review comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2008 | | DONE |
|
|
|
|
Plan resubmittals received | | | 12/8/2008 | | |
Barbara Stitt
|
|
|
|
Plan resubmittals received | | | 12/2/2008 | | |
|
|
|
Plan mod rec'd- two copies of application, submittal packet, and sheet FA-1; taken to fire review
|
Alarm Plan Check | | | 11/24/2008 | | FAIL |
|
|
|
See redlined plans and review comments
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/24/2008 | | DONE |
|
|
|
denied plans at front counter for contractor pick-up
|
Miscellaneous action | | | 11/24/2008 | | DONE |
|
|
|
Faxed review comments to contractor
|
Application received | | | 11/10/2008 | | |
|
|
|
|
Plan assigned to (Stephanie) | 11/10/2008 | | 11/10/2008 | | DONE |
Stephanie L. Cobbley
|
|
|
|