Miscellaneous action | | | 3/11/2009 | | DONE |
|
|
|
Sent for archiving
|
INSP-Final Inspection | 12/24/2008 | 12/24/2008 | 12/24/2008 | P | PASS |
Forrest France
|
|
|
Fire sprinkler permit okay for final per T. Frost.
|
INSP-Sprinkler Rough-in/Hydro | 12/10/2008 | 12/11/2008 | 12/12/2008 | A | PART |
Forrest France
|
|
|
Rough-in inspection passed, one missing hanger added while on site. Hydrostatic test failed due to pressure loss at the guage. Site notes per TF.
|
Telephone call | | | 12/3/2008 | | DONE |
Cathy Brown
|
|
|
tlk to jeff ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 12/3/2008 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 12/3/2008 | | DONE |
|
|
|
|
Application received | | | 12/2/2008 | | |
|
|
|
|
Pending Assignment by SAM | 12/2/2008 | | 12/2/2008 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | | | 12/2/2008 | | PASS |
|
|
|
Passed with comments, see attached
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2008 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 12/2/2008 | | 12/2/2008 | | DONE |
Cathy Brown
|
|
|
|