INSP-Final Inspection | 3/26/2009 | 3/26/2009 | 3/26/2009 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 2/26/2009 | 2/27/2009 | 3/2/2009 | P | PASS |
Troy Cobbley
|
|
|
Rough in is ok to cover. Slight modifications due to field architectural changes but still meets design criteria and code.
|
Inspection Record Card- Fire | 1/28/2009 | | 1/28/2009 | | DONE |
Cathy Brown
|
|
|
|
Telephone call | | | 1/28/2009 | | DONE |
Cathy Brown
|
|
|
tlk to tom dutkus ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/28/2009 | | DONE |
Cathy Brown
|
|
|
|
Issue and Print Permit | | | 1/28/2009 | | |
Tisha Gallop
|
|
|
|
Sprinkler Plan Check | 1/27/2009 | | 1/27/2009 | | PASS |
Scott Arellano
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2009 | | |
|
|
|
|
Inspection Record Card- Fire | 1/27/2009 | | 1/27/2009 | | DONE |
Cathy Brown
|
|
|
|
Permit Ready to Issue | | | 1/27/2009 | | DONE |
|
|
|
|
Issue and Print Permit | | | 1/27/2009 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/27/2009 | | 1/27/2009 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/27/2009 | | DONE |
|
|
|
|
Plan resubmittals received | | | 1/26/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Rec'd three copies of app and plans- taken to fire review
|
Application received | | | 1/20/2009 | | |
|
|
|
|
Pending Assignment by SAM | 1/20/2009 | | 1/20/2009 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/20/2009 | | 1/20/2009 | | FAIL |
Scott Arellano
|
|
|
Application denied. Work exceeds limited criteria for a fire sprinkler quick permit. Resubmittal requirements sent to applicant.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2009 | | DONE |
|
|
|
|
Telephone call | | | 1/20/2009 | | DONE |
|
|
|
tlk to tom dutkus ###-#### regarding the fail permit that needs to be resubmitted
|
Plan assigned to (Scott) | 1/20/2009 | | 1/20/2009 | | DONE |
Cathy Brown
|
|
|
|