Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberFIR09-00578
StatusFinaled
Name CURTIS FIRE SPRINKLER SERVICE INC
Site Address 512 N 8TH ST
Project NameST MICHAEL'S
Customer Number 
ePlanReview 
Description
The Fire Sprinkler Scope of work consists of five changes found during an inspection. Four of the changes affect one head each and are minor in nature. The fifth change involves the kitchen area. The sprinklers were apparently over spaced and have been redesigned. New hydraulics have been provided. The drawing has been reviewed for the balloon areas only.

(ST. MICHAEL'S EPISCOPAL CHURCH - BISHOP TUTTLE HOUSE AND SITE WORK - PHASE I) The Bishop Tuttle House and the Funsten House will be fire sprinklered for story increase and for code trade-offs. To remodel the 3,424 square foot basement and 3,616 square foot 1st story of the Bishop Tuttle House of St. Michael's Episcopal Church. A 950 square foot 1st story mezzanine addition will also be constructed. Work is to include 2 restrooms accessible to the disabled, an elevator shaft, an elevator, interior nonbearing walls, suspended ceilings, a stairway to the new mezzanine, and finishes. The Bishop Tuttle House and the Funsten house will be fully fire sprinklered in conjunction with this permit. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. The combination of parcels must be completed before this permit is finaled. DRH07-00182 (see also DRH01-00010 and CUP01-00002) **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  1/6/2010 DONE
DetailsTim Frost
Taken to scanning
INSP-Final Inspection10/2/200910/2/200910/2/2009PPASS
DetailsForrest France
Scope of fire sprinkler work as indicated on permit documents passed both rough-in and final inspections, permit finaled.
Plan resubmittals received  9/30/2009 DONE
received 3 fire applications and plans sent to Tim Frost in fire.
Sprinkler Plan Check9/30/2009 9/30/2009 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  9/30/2009 DONE
DetailsTim Frost
Inspection Record Card- Fire9/30/2009 9/30/2009 DONE
Details
Telephone call  9/30/2009 DONE
Details
t/c w don at ###-#### - permit ready and fees given
Permit Ready to Issue  9/30/2009 DONE
Details
Issue and Print Permit  9/30/2009 DONE
Plan assigned to (Tim)9/24/2009 9/25/2009 DONE
DetailsTim Frost
Sprinkler Plan Check9/25/2009 9/25/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Telephone call  9/25/2009 DONE
Details
t/c w don at ###-#### - permit denied - needs to be picked up and resubmitted
Plan assigned to (Tim)9/21/2009 9/24/2009 DONE
DetailsTim Frost
10-05-09 New
Sprinkler Plan Check9/24/2009 9/24/2009 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  9/24/2009 DONE
DetailsTim Frost
Telephone call  9/24/2009 DONE
Details
t/c w don at ###-#### - permit denied - needs to be picked up and resubmitted
Plan resubmittals received  9/24/2009  
received three copies of application, submittal documents and plan sheet FP-01; taken to fire review
Application received  9/21/2009