INSP-Final Inspection | 3/17/2011 | 3/18/2011 | 3/18/2011 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 3/7/2011 | 3/8/2011 | 3/8/2011 | A | PART |
Forrest France
|
|
|
Overhead work approved for cover at the drop ceilings.
|
Plan assigned to (Tim) | 2/24/2011 | | 2/28/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/28/2011 | | 2/28/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 2/28/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/28/2011 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 2/28/2011 | | 2/28/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 2/28/2011 | | DONE |
|
|
|
t/c w brodie - permit ready and fees given
|
Permit Ready to Issue | | | 2/28/2011 | | DONE |
|
|
|
|
Issue and Print Permit | | | 2/28/2011 | | DONE |
Barbara Stitt
|
|
|
|
Miscellaneous action | | | 2/24/2011 | | DONE |
|
|
|
Plan on hold pending building deparment review to determine if CO is required.
|
Application received | | | 2/24/2011 | | |
|
|
|
|
Pending Assignment by SAM | 2/24/2011 | | 2/24/2011 | | DONE |
Patricia Smith
|
|
|
|