INSP-Final Inspection | 6/23/2011 | 6/24/2011 | 6/24/2011 | A | PASS |
Forrest France
|
|
|
Fire sprinkler permit finaled.
|
INSP-Sprinkler Rough-in | 6/22/2011 | 6/23/2011 | 6/23/2011 | A | PART |
Forrest France
|
|
|
Overhead fire sprinkler work passed rough-in inspection.
|
Issue and Print Permit | | | 6/22/2011 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 6/6/2011 | | 6/7/2011 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/7/2011 | | 6/7/2011 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 6/7/2011 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2011 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Inspection Record Card- Fire | 6/7/2011 | | 6/7/2011 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 6/7/2011 | | DONE |
Barbara Stitt
|
|
|
Called Don and told him that permit is ready & fees due on 6-7-11 @ 8:30am///BAS
|
Application received | | | 6/6/2011 | | |
|
|
|
|