Miscellaneous action | | | 11/14/2011 | | DONE |
|
|
|
Plans taken to records for scanning.
|
INSP-Alarm Testing | 10/20/2011 | 10/20/2011 | 10/25/2011 | A | PASS |
Forrest France
|
|
|
Tim Christopherson- phone #: ###-#### call 30 min. prior.
|
INSP-Final Inspection | 10/18/2011 | 10/21/2011 | 10/21/2011 | A | PASS |
Forrest France
|
|
|
Verified plan modification, new submittal. Fire alarm permit final approved.
|
CHANGE STATUS TO (ISS) | | | 10/11/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 9/29/2011 | | 10/7/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Alarm Plan Check | 10/7/2011 | | 10/7/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Plan modification approved with redlines and review comments
|
PLANS TAKEN FRONT DESK ALARM | | | 10/7/2011 | | DONE |
|
|
|
Redlined plan modification documents available at front counter.
|
Inspection Record Card- Fire | 10/7/2011 | | 10/7/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 10/7/2011 | | DONE |
|
|
|
left vm for byran - permit (plan mod) ready and fees given
|
Permit Ready to Issue | | | 10/7/2011 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/29/2011 | | |
|
|
|
|
INSP-Final Inspection | 9/22/2011 | 9/27/2011 | 9/27/2011 | A | PART |
Forrest France
|
|
|
Functional testing passed, however the FACP on site is not a 5808 as indicated in the permit documents. A plan modification will be necessary prior to permit final.
|
INSP-Final Inspection | 9/8/2011 | 9/15/2011 | 9/14/2011 | A | CANC |
Forrest France
|
|
|
Tim Christopherson Phone #: ###-#### >> Inspection requested via web by Diane Turner Inspection cancelled from web by: Diane Turner
|
Issue and Print Permit | | | 6/15/2011 | | DONE |
|
|
|
|
Plan assigned to (Stephanie) | 6/8/2011 | | 6/14/2011 | | DONE |
Stephanie L. Cobbley
|
|
|
|
Telephone call | | | 6/14/2011 | | DONE |
|
|
|
Requested revised I/O matrix that pertains specifically to this project (i.e. sprinkler monitoring was indicated on the matrix and the building is non-sprinklered etc...)
|
Miscellaneous action | | | 6/14/2011 | | DONE |
|
|
|
Recieved requested revised matrix
|
1st review completed | | | 6/14/2011 | | DONE |
|
|
|
|
Alarm Plan Check | 6/14/2011 | | 6/14/2011 | | PASS |
Stephanie L. Cobbley
|
|
|
Approved with redlines and review comments.
|
PLANS TAKEN FRONT DESK ALARM | | | 6/14/2011 | | DONE |
|
|
|
Approved redlined plans available at front counter.
|
Inspection Record Card- Fire | 6/14/2011 | | 6/14/2011 | | DONE |
Patricia Smith
|
|
|
|
Telephone call | | | 6/14/2011 | | DONE |
|
|
|
t/c w rose - permit ready and fees given
|
Permit Ready to Issue | | | 6/14/2011 | | DONE |
|
|
|
|
Application received | | | 6/8/2011 | | |
|
|
|
|