Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberFIR11-00483
StatusFinaled
Name JBL FIRE PROTECTION LLC
Site Address 3676 E WARM SPRINGS AVE
Project Name3051 WISE WAY
Customer Number 
ePlanReviewNo
Description
The Fire Sprinkler Scope of work consists of providing above and below fire protection in a new two level firehouse. Each level is protected with a tree system utilizing telescoping branch piping. There is a small antifreeze system in the Attic Crown. The system is supplied through 6” underground with a 4” reduced pressure backflow preventer to floor control valves. The system has been designed for light hazard throughout except for the apparatus bay, which is ordinary hazard group I.


Building Department Scope:

Boise Fire Station #15 - To construct a new 11,210 square foot, two story, wood framed and masonry fire station and related site improvements. This building is fully fire sprinkled. First Floor: 8,210 sq. ft. Second Floor: 3,000 sq. ft.. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Miscellaneous action  10/11/2012 DONE
DetailsTim Frost
Sent to Records for scanning.
INSP-Final Inspection7/5/20127/5/20127/6/2012PPASS
DetailsForrest France
Final walkthrough and inspection completed satisfactory. Fire sprinkler permit finaled.
INSP-Final Inspection6/22/20126/22/20126/22/2012PNR
DetailsForrest France
Final pending project related fire alarm permit work.
INSP-Final Inspection6/19/20126/21/20126/21/2012APART
DetailsForrest France
For inspection items noted 6/18.
INSP-Final Inspection6/18/20126/18/20126/18/2012PCANC
DetailsTroy Cobbley
Jeremy actually wanted a conference/walk through. I found one upright sprinkler head in a second floor room that is blocked by a surface mounted light. Also several pendant heads in the truck bay have ordinary temp heads in locations where intermediate and high temp. heads are required at the unit heaters.
Miscellaneous action  4/30/2012 DONE
Tim/Forrest,

Re: FIR11-00483 - 3676 E. Warm Springs Ave.

The building will be maintained above the -10 so the antifreeze will not be an issue for this project. Please consider this email a letter from the owner.


Regards,

Romeo P. Gervais, P.E.
Deputy Chief - Fire Marshal
Boise Fire Department

Ph: ###-####
INSP-Sprinkler Rough-in/Hydro4/16/20124/16/20124/19/2012PPART
DetailsForrest France
Pendent head relocations at sheetrock ceilings due to fixture obstructions.
INSP-Sprinkler Rough-in/Hydro4/12/20124/13/20124/13/2012APASS
DetailsTim Frost
Both systems passed overhead hydro.
INSP-Sprinkler Rough-in/Hydro3/5/20123/5/20123/5/2012APASS
DetailsForrest France
Rough-in passed.
INSP-Sprinkler Rough-in1/19/20121/19/20121/24/2012PPART
DetailsForrest France
INSP-Sprinkler Rough-in1/23/20121/23/20121/23/2012APART
DetailsForrest France
Noted correction items finished. Overhead rough-in only passed.
INSP-Sprinkler Rough-in1/17/20121/18/20121/18/2012PPART
DetailsForrest France
Rough-in inspection completed. Noted items include obstructed upright coverage at the 1st and 2nd floors at some locations due to ductwork, adjacent truss webs, etc. Verified previous c/n items.
INSP-Sprinkler Rough-in1/17/20121/17/20121/18/2012PPART
DetailsForrest France
C/N items include missing coverage below stairway at the concealed space, obstructed pendent heads at two restrooms, need to provide coverage at combustible concealed spaces or meet allowable exceptions per NFPA 13, plans do not show pendent heads at the equipment bay area.
INSP-Conference1/17/20121/17/20121/17/2012ADONE
DetailsForrest France
Regarding location of the wall post indicator control valve.
Miscellaneous action  1/6/2012 DONE
Reviewed new seismic brace SB-3. It appears to comply with NFPA. Please, see document
INSP-Supply line flush10/6/201110/7/201110/7/2011PPART
DetailsForrest France
UG fire supply line flush completed acceptable.
INSP-Sprinkler Rough-in/Hydro9/30/20119/30/20119/30/2011PPASS
DetailsForrest France
UG fire supply line hydrostatic testing passed.
INSP-Sprinkler Rough-in9/27/20119/27/20119/28/2011PPASS
DetailsTroy Cobbley
Underground cover inspection passed. Piping can be covered.
Issue and Print Permit  9/27/2011 DONE
DetailsBarbara Stitt
Plan resubmittals received  9/22/2011 DONE
DetailsTisha Gallop
received one copy of application, and three copies of small documents and plans; rourted to fire review
Sprinkler Plan Check9/22/2011 9/22/2011 PASS
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
PLANS/APPL TAKEN TO FRONT DESK  9/22/2011 DONE
DetailsTim Frost
Inspection Record Card- Fire9/22/2011 9/22/2011 DONE
DetailsPatricia Smith
Telephone call  9/22/2011 DONE
left vm for jonathan - permit ready and fees given
Permit Ready to Issue  9/22/2011 DONE
Details
Plan assigned to (Tim)9/7/2011 9/22/2011 DONE
DetailsTim Frost
Sprinkler Plan Check9/21/2011 9/21/2011 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
Telephone call  9/21/2011 DONE
t/c w jonathan - permit denied - needs to be picked up and resubmitted
Plan resubmittals received  9/16/2011 DONE
DetailsTisha Gallop
received three copies of applcation, small documents and plans; routed to Fire Review.
Sprinkler Plan Check9/13/2011 9/13/2011 FAIL
DetailsTim Frost
Please, see attached comments.
There are NO annotations on the plans.
1st review completed  9/13/2011 DONE
DetailsTim Frost
Miscellaneous action  9/13/2011 DONE
DetailsTim Frost
Emailed review to contractor
Telephone call  9/13/2011 DONE
t/c w jonathan - permit denied - needs to be picked up and resubmitted
Application received  9/7/2011  
Case Summary  9/7/2011 DONE