Miscellaneous action | | | 4/8/2013 | | DONE |
Tim Frost
|
|
|
Sent to Records for scanning.
|
INSP-Final Inspection | 11/8/2012 | 11/8/2012 | 11/8/2012 | A | PASS |
Forrest France
|
|
|
UG fire supply line permit approved for final.
|
INSP-Final Inspection | 9/12/2012 | 9/13/2012 | 9/13/2012 | P | PEND |
Forrest France
|
|
|
russ Phone #: ###-####
|
INSP-Supply line flush | 8/28/2012 | 8/29/2012 | 8/29/2012 | P | PART |
Forrest France
|
|
|
UG fire supply line flush completed satisfactory.
|
INSP-Sprinkler Rough-in/Hydro | 8/27/2012 | 8/27/2012 | 8/28/2012 | P | PART |
Forrest France
|
|
|
UG fire supply line hydrostatic test passed.
|
INSP-Sprinkler Rough-in | 6/22/2012 | 6/22/2012 | 6/22/2012 | P | PART |
Forrest France
|
|
|
UG fire supply line including the IBR are approved for bury. Need to provide seismic clearance at the floor slab when poured.
|
Issue and Print Permit | | | 5/29/2012 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 5/24/2012 | | 5/25/2012 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 5/25/2012 | | 5/25/2012 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
There are NO annotations on the plans.
|
1st review completed | | | 5/25/2012 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/25/2012 | | DONE |
Tim Frost
|
|
|
|
Inspection Record Card- Fire | 5/25/2012 | | 5/25/2012 | | DONE |
Christina Prado
|
|
|
|
Permit Ready to Issue | | | 5/25/2012 | | DONE |
Christina Prado
|
|
|
|
Telephone call | | | 5/25/2012 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 5/24/2012 | | |
|
|
|
|