Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberFIR13-00116
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 200 W BROAD ST
Project NameCSHQA 2B OFFICE
Customer Number 
ePlanReviewYes
Description
The fire sprinkler scope of work consists of a new fire protection system for an existing building. The system is a 2½”x2”x1½” grid supplied by 6”x44’ C-900 underground piping through a 3” backflow preventer with wall PIV, 3” riser and 3” feed main.

This project is a change of occupancy.

Plan Mod #1 - 4/18/2013
Changed patio, riser room, stairs and bike room to dry system. Respace some sprinkler due to the removal of a collapsible wall.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/29/20137/29/20137/29/2013PPASS
DetailsForrest France
Fire sprinkler work passed final walkthrough and inspection. Permit finaled.
INSP-Final Inspection7/25/20137/26/20137/26/2013ANR
DetailsForrest France
Don f. is TVFP site contact ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt
INSP-Final Inspection7/22/20137/23/20137/23/2013APART
DetailsForrest France
Okay to cover remainder of the drop ceilings in the conference room, ssu relocated. Final pending riser supervision.
INSP-Final Inspection7/15/20137/16/20137/16/2013PPART
DetailsForrest France
Concluded satisfactory 24 hr. pneumatic test of the new dry system with no pressure loss at the guage. Also finished the remainder of overhead inspection with the exception of the drop ceiling pendents at conf. room 107. Noted one overspaced upright to be relocated.
INSP-Sprinkler Rough-in7/15/20137/15/20137/15/2013PPASS
DetailsTroy Cobbley
24 air test on dry system started at 1:30 with 45psi on the guage
INSP-Sprinkler Rough-in/Hydro6/27/20136/28/20136/28/2013APART
DetailsForrest France
Overhead hydrostatic test of the new dry and wet systems passed. Also okayed for cover work at sheetrock ceilings in the bike room, and west entryway.
INSP-Sprinkler Rough-in6/20/20136/20/20136/20/2013APART
DetailsForrest France
Ref. stamped plans for locations above hard lids okayed for cover.
INSP-Supply line flush6/17/20136/17/20136/17/2013PPART
DetailsForrest France
UG fire supply line flush completed (post hydrostatic test).
INSP-Sprinkler Rough-in6/12/20136/13/20136/17/2013PPART
DetailsForrest France
Overhead rough-in at the west and east side restrooms, RR vestibules, and patio areas are approved for cover as marked and dated on stamped plan set.
INSP-Sprinkler Rough-in/Hydro6/12/20136/12/20136/12/2013PPART
DetailsForrest France
UG fire supply line hydrostatic test completed satisfactory.
INSP-Sprinkler Rough-in5/29/20135/29/20135/29/2013APART
DetailsForrest France
UG including the tie-in and 45 ell okay for cover. Overhead work in progress.
INSP-Sprinkler Rough-in5/22/20135/22/20135/22/2013PPART
DetailsForrest France
UG fire supply line including the IBR and stub out are approved for bury.
Sprinkler Plan Check4/19/2013 4/19/2013 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  4/19/2013 DONE
DetailsTim Frost
CHANGE STATUS TO (ISS)  4/19/2013 DONE
plan mod
Plan assigned to (Tim)4/18/2013 4/18/2013 DONE
DetailsTim Frost
Plan assigned to (Tim)3/19/2013 3/19/2013 DONE
DetailsTim Frost
Sprinkler Plan Check3/19/2013 3/19/2013 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  3/19/2013 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  3/19/2013 DONE
DetailsTim Frost
Permit Ready to Issue  3/19/2013  
Permit Ready to Issue  3/19/2013 DONE
Issue and Print Permit  3/19/2013 DONE
Inspection Record Card- Fire3/19/2013 3/19/2013 DONE
DetailsChristina Prado
Application received  3/13/2013 DONE
Application submitted via PDS Online on Mar 13 2013 1:55PM