INSP-Final Inspection | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
Coltin Phone #: ###-####
|
INSP-Sprinkler Rough-in/Hydro | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Troy Cobbley
|
|
|
The hydro test for the FDC passed.
Colton Cox is the contact for this FDC Hydro inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/23/2018 | 5/29/2018 | 5/30/2018 | P | CANC |
Troy Cobbley
|
|
|
Wrong building was scheduled.
Colton Cox is the contact for this rough-in on 6 units. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Final Inspection | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | FAIL |
Troy Cobbley
|
|
|
Need to pass the hydro test on the FDC
Robert would like this inspection at 11AM, if possible. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test for the first and second floor systems passed. The hydro test for the FDC failed due to visible leakage on exterior wall
|
INSP-Supply line flush | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
INSP-Sprinkler Rough-in | 2/26/2018 | 2/28/2018 | 2/28/2018 | A | PASS |
Troy Cobbley
|
|
|
Piping rough-in and tenting inspection passed. Piping can be covered.
|
Plan Modification Accepted | | | 2/27/2018 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 2/27/2018 | | 2/27/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/27/2018 | | 2/27/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/27/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/27/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
|
Issue and Print Permit | | | 2/27/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 2/23/2018 | | 2/23/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/23/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 2/23/2018 | | DONE |
Christina Prado
|
|
|
All met
|
Issue and Print Permit | | | 2/23/2018 | | DONE |
|
|
|
|
Intake Approval | | | 2/22/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 2/22/2018 | | 2/22/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/22/2018 | | 2/22/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 2/22/2018 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 2/22/2018 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 2/21/2018 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 21 2018 8:03AM
|