Information based on query as of Friday, September 27, 2024.
Permit Information
Permit NumberGCB11-00102
StatusFinaled
Name DALE BINNING
Site Address 4500 W CHINDEN BLVD
Project NameBLD2011-00100
Customer Number 
ePlanReviewNo
Description
Mac's Radiator/AC/Exhaust Repair - To construct an interior remodel to an existing 8,308 square foot building for this tenant. Work to include: construct an interior non-bearing 2X6 wood stud wall to divide the warehouse area from the radiator shop per plans; sawcut the existing floor slab and pour a concrete trench drain per plans; install through roof vents in select locations per plans; install vertical grab bars in both accessible restrooms; relocate existing lavatories locations to meet accessibility; install a permanent accessible point of sale counter; install tactile exit signs adjacent to exit doors; related interior finishes in compliance with chapter 8 of the 2009 IBC; and plumbing, electrical work. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. A new Certificate of Occupancy with the new occupant load total is required to be obtained after all work has been inspected and approved and prior to tenant occupying this space. No new lighting or mechanical work is proposed or allowed under this permit. This building is NOT fire sprinklered. **SRZ**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final1/19/20121/20/20121/20/2012APASS
DetailsDave Hannah
Elliot @ ###-####
GCB-Courtesy1/11/20121/11/20121/11/2012PDONE
DetailsMike Jordan
Elliot @ ###-####Call to setup meeting. meeting at 2:30 pm. Went over plans and door hardware issues with contractor. Noted that new walls that were constructed were done prior to permit being issued and are completed and sheet rocked at this time. No other trades work are i n walls that require inspections. New walls are non load bearing walls.
GCB-Courtesy1/10/20121/11/20121/11/2012APASS
DetailsMike Jordan
Elliot @ ###-####Call to setup meeting. Called elliot and set up meeting for 2:30pm.
Plan assigned to (SRZ)12/12/201112/12/201112/27/2011 DONE
DetailsSam Zahorka
Routing - PLAN CHECK12/12/2011 12/27/2011 PASS
DetailsSam Zahorka
Sam Zahorka
1st review completed  12/27/2011 DONE
DetailsSam Zahorka
PLANS/APPL TAKEN TO FRONT DESK  12/27/2011 DONE
DetailsSam Zahorka
Issue and Courier  12/27/2011 DONE
Application received  12/8/2011 DONE