Final | 7/16/2002 | 7/17/2002 | 7/17/2002 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/16/2002 at 16:28:47. Contact: ###-####.
|
DOC - Permit Finaled | 7/17/2002 | 7/17/2002 | 7/17/2002 | P | PASS |
Dixie Fellows
|
|
|
Finaled by inspector at 7/17/2002 2:29:43 PM
|
Final | 7/15/2002 | 7/15/2002 | 7/15/2002 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 07/15/2002 at 11:18:12. Contact: ###-####. TALKED TO DAVE ABOUT F/A TO ECONOMIZERS..DUCT DETECTORS DONE BY RICK J 7/15/2002 3:35:07 PM
|
Final | 6/27/2002 | 6/27/2002 | 6/27/2002 | P | PART |
Dixie Fellows
|
|
|
sandy ###-#### TEMP OCC OK..NEED SHUT OFF OUTSIDE OF F/P 6/27/2002 3:22:33 PM
|
Final | 5/14/2002 | 5/14/2002 | 5/14/2002 | P | NR |
Dixie Fellows
|
|
|
###-#### SANDY need to open up rest of oval vent..frame f/p...will check all on next inspection 5/14/2002 5:22:12 PM
|
Override - Parcel Holds | | | 5/14/2002 | | |
|
|
|
|
Rough-in | 4/11/2002 | 4/11/2002 | 4/11/2002 | P | FAIL |
Dixie Fellows
|
|
|
need specs on f/p comb air intake termination 4/11/2002 5:52:04 PM
|
Override - Parcel Holds | | | 4/11/2002 | | |
|
|
|
|
Final | 4/10/2002 | 4/10/2002 | 4/10/2002 | P | FAIL |
Dave Lightfoot
|
|
|
###-#### c/n posted 4/10/2002 1:37:39 PM
|
Override - Parcel Holds | | | 4/10/2002 | | |
|
|
|
|
Application received | | | 3/21/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 3/21/2002 | | |
|
|
|
|
Issue & PRINT permit | | | 3/21/2002 | | DONE |
|
|
|
|