Final | 7/25/2008 | 8/1/2008 | 8/1/2008 | A | PASS |
Bill VanDegrift
|
|
|
gas furnace, a/c, new coil Phone #: ###-#### Internet Inspection Request from: Yolanda Morris final ok with the joint betwen the furnace and the coil sealed and a piece of pipe in the tee on the secondary drain.
|
Application received | | | 7/22/2008 | | DONE |
|
|
|
This permit was created on the web by Yolanda Morris
|