Final | 8/12/2011 | 8/15/2011 | 8/15/2011 | A | PASS |
Eric Strole
|
|
|
Please call Brian if any corrections needed. ###-####. Thanks, Andrea. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek
|
Pressure Test | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Eric Strole
|
|
|
Matt is scheduled for 10:30am ductblaster test, please call Brian ###-#### if any corrections needed. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-20 lb test pass
|
Rough-in | 7/5/2011 | 7/6/2011 | 7/6/2011 | A | PASS |
Eric Strole
|
|
|
Matt is scheduled for 10:30am ductblaster test, please call Brian ###-#### if any corrections needed. Phone #: ###-#### x0000 >> Inspection requested via web by Andrea Creek-blast test & rough-in pass
|
Application received | | | 7/5/2011 | | DONE |
|
|
|
This permit was created on the web by Andrea Creek
|