Final | 10/19/2011 | 10/20/2011 | 10/20/2011 | A | PASS |
Dixie Fellows
|
|
|
oleg Phone #: ###-####
|
Rough-in | 8/25/2011 | 8/25/2011 | 8/25/2011 | P | PASS |
Eric Strole
|
|
|
oleg Phone #: ###-####
|
Rough-in | 8/23/2011 | 8/24/2011 | 8/24/2011 | A | FAIL |
Eric Strole
|
|
|
oleg - duct blast - around 11:00 if possible please Phone #: ###-####-20 lb gas test, duct blast test pass. need to frame in b-vent 2nd flr, add transfer grills 1st flr & grade fresh air & exhaust at furnace.
|
Rough-in | 8/22/2011 | 8/23/2011 | 8/23/2011 | P | CANC |
Eric Strole
|
|
|
oleg Phone #: ###-####-need approved manual j report on site.
|
Application received | | | 8/18/2011 | | |
|
|
|
|
Issue permit | | | 8/18/2011 | | DONE |
|
|
|
|