Final | 12/13/2011 | 12/13/2011 | 12/13/2011 | P | PASS |
Eric Strole
|
|
|
|
Final | 12/12/2011 | 12/13/2011 | 12/13/2011 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino no air balance report on site, looked in basket at furnace twice
|
Pressure Test | 10/12/2011 | 10/13/2011 | 10/13/2011 | A | PASS |
Eric Strole
|
|
|
Building Energy will perform the duct blast test on 10/13/11 at 9am Phone #: ###-#### >> Inspection requested via web by Debbie Marino-20 lb gas test pass.
|
Rough-in | 10/12/2011 | 10/13/2011 | 10/13/2011 | A | PASS |
Eric Strole
|
|
|
Building Energy will perform the duct blast test on 10/13/11 at 9am Phone #: ###-#### >> Inspection requested via web by Debbie Marino-rough-in and duct blast test pass.
|
Issue permit | | | 10/11/2011 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 10/7/2011 | | DONE |
|
|
|
This permit was created on the web by Debbie Marino
|