Final | 3/6/2018 | 3/7/2018 | 3/7/2018 | A | PASS |
Ben Livingston
|
|
|
Final Inspection needed for Phillips residence if you have any questions call Karl at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin
|
Final | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PART |
Ben Livingston
|
|
|
needs a 3" 45 on the flue termination to discharge away from the brick chimney, needs someone to permit the gas line to the range( BBQ looks old) and tie into 3/4" instead of the 1/2" furnace drop. corrections not made
|
Final | 2/6/2018 | 2/7/2018 | 2/7/2018 | P | PART |
Bill VanDegrift
|
|
|
Final mechanical inspection needed. The manual J and the air balance report is on the island.Please call Karl if you have any questions or concerns at ###-#### thank you. Phone #: ###-#### Inspection requested via web by Karl Hestekin, needs a 3" 45 on the flue termination to discharge away from the brick chimney, needs someone to permit the gas line to the range( BBQ looks old) and tie into 3/4" instead of the 1/2" furnace drop. a little light on air to the master, they will adjust if required.
|
Mec-Aging Inspection | 1/9/2018 | 1/9/2018 | 1/9/2018 | | PEND |
Ben Livingston
|
|
|
|
Rough-in | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Ben Livingston
|
|
|
Flu pressure test needed for Phillips Residence today if there are any questions please call Karl at ###-#### Phone #: ###-#### Inspection requested via web by Karl Hestekin 5lb flue
|
Pressure Test | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | FAIL |
Ben Livingston
|
|
|
Reschedule pressure test please call Karl with questions ###-#### Phone #: ###-#### Inspection requested via web by Karl Hestekin gauge at zero
|
Pressure Test | 10/4/2017 | 10/4/2017 | 10/4/2017 | P | NR |
Ben Livingston
|
|
|
Flue Pressure test needed for P.M. today if you have any questions please call Karl at ###-####
|
Mec-Aging Inspection | 9/22/2017 | 9/22/2017 | 9/22/2017 | | PEND |
Bill VanDegrift
|
|
|
no additional calls for inspection
|
Rough-in | 5/12/2017 | 5/12/2017 | 5/12/2017 | P | PART |
Ben Livingston
|
|
|
Need a reinspection for P.m. today thank you, Phillips Residence if you need to contact anyone please call Karl at ###-####. Phone #: ###-#### Inspection requested via web by Karl Hestekin 1stand 2nd floor okay, basement not ready
|
Rough-in | 5/12/2017 | 5/12/2017 | 5/12/2017 | A | FAIL |
Ben Livingston
|
|
|
Reinspection needed for am Phillips residents cover inspection mechanical if any questions please contact Karl ###-#### thank you Phone #: ###-#### Inspection requested via web by Karl Hestekin need approved manual j for roughin inspection
|
Rough-in | 5/10/2017 | 5/11/2017 | 5/11/2017 | P | NR |
Ben Livingston
|
|
|
Need a cover inspection for Phillips Res. P.M., please will not be ready until P.M. thank you.If you have questions or can not complete the P.M. inspection please contact Karl at ###-#### Phone #: ###-#### Inspection requested via web by Karl Hestekin
|
Issue PAID IN FULL permit | | | 3/2/2017 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/2/2017 | | DONE |
|
|
|
This permit was created on the web by Karl Hestekin
|