Final | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PASS |
Brian Scoles
|
|
|
Randy Phone #: ###-####- range hood ok
|
Final | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | CANC |
Brian Scoles
|
|
|
Randy Phone #: ###-####- should have been R/I inspection- final later after cabinets installed and range hood
|
Rough-in | 9/12/2017 | 9/12/2017 | 9/12/2017 | P | PASS |
Brian Scoles
|
|
|
Randy Phone #: ###-####- range hood R/I ok
|
Pressure Test | 9/11/2017 | 9/12/2017 | 9/12/2017 | A | PASS |
Brian Scoles
|
|
|
Randy Phone #: ###-####- 20lb gas pass
|
Application received | | | 9/11/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/11/2017 | | DONE |
|
|
|
|