Final | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | PASS |
Eric Strole
|
|
|
Final Inspection. Please call Doug at Greens Heating with time of inspection so he can meet the inspector at the site. Phone #: ###-#### Inspection requested via web by Jerry Crist
|
Pressure Test | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | PASS |
Eric Strole
|
|
|
20 lb gas test pass
|
Conference | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | DONE |
Eric Strole
|
|
|
Consult with inspector and General Manager 1:00 p.m. Phone #: ###-#### Inspection requested via web by Jerry Crist
|
Pressure Test | 1/17/2018 | 1/18/2018 | 1/18/2018 | A | FAIL |
Eric Strole
|
|
|
Pressure Test Inspection. Gas piping for decorative lighting for new sub division. Phone #: ###-#### Inspection requested via web by Jerry Crist-20 lb gas test fail. Pipe needs to be a minimum of 8" deep to the top of pipe. PVC sleeve needs to be watertight. Fittings just come apart. Need to use an approved glue for material being used.
|
Issue PAID IN FULL permit | | | 1/16/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 1/16/2018 | | |
|
|
|
|
Application received | | | 1/16/2018 | | DONE |
|
|
|
This permit was created on the web by Jerry Crist
|
First Notice | 3/15/2018 | 3/15/2018 | | | |
Eric Strole
|
|
|
|