Final | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PASS |
Jack Reynolds
|
|
|
final - call travis Phone #: ###-#### Inspection requested via web by Brandon Sorensen- access doors ok- dryer vent ok- final ok signed card
|
Final | 8/27/2018 | 8/27/2018 | 8/27/2018 | P | PART |
Jack Reynolds
|
|
|
final Phone #: ###-#### Inspection requested via web by Brandon Sorensen- lineset penetrations ok- lineset support ok- condensates ok- still need a few more access doors in hard lid ceiling and labeling on all doors
|
Final | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | NR |
Jack Reynolds
|
|
|
final Phone #: ###-#### Inspection requested via web by Brandon Sorensen- not ready
|
Rough-in | 8/23/2018 | 8/24/2018 | 8/24/2018 | A | PASS |
Jack Reynolds
|
|
|
flue re-inspect Phone #: ###-#### Inspection requested via web by Brandon Sorensen - unit number 7 5 lb flue test ok -still need to see condensates done by others - need to see hard lid access doors by others - line sets on roof need supports and line set penentrations need sealed on roof - all this for a final
|
Rough-in | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PART |
Jack Reynolds
|
|
|
pressure test flues Phone #: ###-#### Inspection requested via web by Brandon Sorensen- 7 out of the 8 5lb flue test passed- unit number 7 couldnt hold 5lb- primary and secoundary condensates drains still need ran- need to see access doors installed in hard lid ceiling with labels at final- fire damper clearances to sheet rock ok
|
Rough-in | 8/17/2018 | 8/20/2018 | 8/20/2018 | A | PASS |
Jack Reynolds
|
|
|
cover Phone #: ###-#### Inspection requested via web by Brandon Sorensen- R/I ok- ok for cover
|
Final | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | CANC |
Jack Reynolds
|
|
|
pressure test for flue and final - call travis Phone #: ###-#### >> Inspection requested via web by Brandon Sorensen Inspection cancelled from web by: Brandon Sorensen
|
Rough-in | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PART |
Jack Reynolds
|
|
|
cover inspection Phone #: ###-#### Inspection requested via web by Brandon Sorensen- fire/smoke dampers installed ok- access openings for balance dampers ok- fresh air ducting and supply runs still need insulation- a few locations still need duct seal finished
|
Rough-in | 6/19/2018 | 6/21/2018 | 6/21/2018 | A | FAIL |
Chad Schwendiman
|
|
|
rough in - call Travis Phone #: ###-#### Inspection requested via web by Brandon Sorensen - Need framing around all 4 sides of fire/smoke dampers per installation instructions, Need access door framing in for balance dampers, need to insulate supply and return duct work above hard lids
|
Issue PAID IN FULL permit | | | 6/19/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 6/19/2018 | | DONE |
|
|
|
This permit was created on the web by Brandon Sorensen
|
First Notice | 8/30/2018 | 8/30/2018 | | | |
Jack Reynolds
|
|
|
|