INSP-Final | 5/16/2017 | 5/16/2017 | 5/16/2017 | P | PASS |
Scott Arellano
|
|
|
Paint Booth suppression system tested OK. Powder coating booth and industrial oven to be permitted and protected separately.
|
Plan assigned to (Tim) | 5/8/2017 | | 5/9/2017 | | PASS |
Tim Frost
|
|
|
Plans taken to front counter. Attached comments to plans.
|
Permit Ready to Issue | | | 5/9/2017 | | DONE |
|
|
|
|
Issue and Courier | | | 5/9/2017 | | DONE |
|
|
|
put in inner office mail and emailed Shelley
|
Plan resubmittals received | | | 5/8/2017 | | DONE |
|
|
|
resubmittals received 4 new sets and also included the old ones that failed-took to Tim Frost for review
|
Telephone call | | | 5/4/2017 | | DONE |
Scott Arellano
|
|
|
Spoke with the owner Mike regarding the requirement for an audible/visual bell at the paint station. After further evaluation, it was determined that the notification bell for this unit would not be necessary due to the openess of the point of use (pos) painting station. Therefore, there is no requirement for this bell.
|
Miscellaneous action | | | 5/4/2017 | | DONE |
|
|
|
Sent email to applicant telling them that the bell is not required due to the small size of the booth.
|
Sprinkler Plan Check | 5/3/2017 | | 5/3/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 5/3/2017 | | FAIL |
|
|
|
|
Miscellaneous action | | | 5/3/2017 | | DONE |
|
|
|
sent plans back to NACFR-Tim Frost failed the plan review
|
Application received | | | 5/2/2017 | | |
|
|
|
|
Plan assigned to (Tim) | 5/2/2017 | | | | |
Tim Frost
|
|
|
|