Final | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 10/4/2007 at 6:59:49 AM. Contact: ###-####.
|
Plumbing Rough-in | 8/13/2007 | 8/13/2007 | 8/13/2007 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/13/2007 at 7:44:27 AM. Contact: ###-####. ri ok with wh t&p drain piped to the washer box with an airgap and hub drain capped.
|
Groundwork | 7/2/2007 | 7/3/2007 | 7/3/2007 | P | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 7/2/2007 at 9:14:27 PM.
|
Application received | | | 7/2/2007 | | |
|
|
|
|
Issue permit | | | 7/2/2007 | | DONE |
|
|
|
|