Second Notice PLM | 6/9/2008 | 6/9/2008 | 6/11/2008 | | DONE |
Darla L Downs
|
|
|
First Notice has not been responded to.
|
First Notice | 4/16/2008 | 4/16/2008 | 6/9/2008 | | DONE |
Daryl Spivey
|
|
|
|
Final | 4/15/2008 | 4/16/2008 | 4/16/2008 | A | PASS |
Daryl Spivey
|
|
|
Bill Phone #: ###-#### Internet Inspection Request from: raul castanon
|
Final | 4/14/2008 | 4/15/2008 | 4/15/2008 | A | CANC |
Daryl Spivey
|
|
|
jack Phone #: ###-#### called in by general not the plumber. Plumber will call in when ready..........ds
|
Final | 3/18/2008 | 3/18/2008 | 3/18/2008 | P | PART |
Daryl Spivey
|
|
|
Phone #: ###-#### Internet Inspection Request from: raul castanon units 403,404,405,503,504, and 507 needs 1" airgap on T&P and dcva installed on garbage chute wash.............ds
|
Final | 3/5/2008 | 3/6/2008 | 3/6/2008 | A | FAIL |
Daryl Spivey
|
|
|
1st and 2nd floors Phone #: ###-#### Internet Inspection Request from: raul castanon Still have T&P's that need 1" airgap and need B/F installed on waste chute water lines..............ds
|
Final | 2/26/2008 | 2/26/2008 | 2/26/2008 | P | FAIL |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 2/26/2008 at 9:19:15 AM. Contact: ###-####. For 3rd,4th and 5th floors.. All T&P's on water heater need to have 1" airgap a point of drain......Water for waste chute needs to have rpbp installed
|
PLM-Aging Inspection | 1/21/2008 | 1/21/2008 | 1/22/2008 | | NR |
Daryl Spivey
|
|
|
wip
|
Plumbing Rough-in | 10/22/2007 | 10/23/2007 | 10/23/2007 | P | DONE |
Daryl Spivey
|
|
|
5th floor and roof drain rough-in! Phone #: ###-#### Internet Inspection Request from: raul castanon
|
Plumbing Rough-in | 10/22/2007 | 10/22/2007 | 10/22/2007 | P | PASS |
Daryl Spivey
|
|
|
parkcenter..5th floor.....tested ok... roof drains tested also....ds
|
Plumbing Rough-in | 10/3/2007 | 10/4/2007 | 10/4/2007 | P | PART |
Daryl Spivey
|
|
|
Rough-In inspection on 3rd. 4th, and 5th floor. Call Shawn with any questions. Phone #: ###-#### Internet Inspection Request from: raul castanon
|
Plumbing Rough-in | 9/21/2007 | 9/21/2007 | 9/21/2007 | P | PART |
Daryl Spivey
|
|
|
Partial for 1st and 2nd floors only.
Contact: Shawn Phone #: ###-#### Internet Inspection Request from: raul castanon waste, vent and water tested up thru 2nd floor....ds
|
Application received | | | 9/20/2007 | | DONE |
|
|
|
This permit was created on the web by raul castanon
|