Final | 4/3/2008 | 4/3/2008 | 4/3/2008 | P | PASS |
Daryl Spivey
|
|
|
|
Final | 3/26/2008 | 3/27/2008 | 3/27/2008 | A | FAIL |
Daryl Spivey
|
|
|
Please call if we don''t get a green tag. Home will be open Phone #: ###-#### Internet Inspection Request from: Steve Spence needs rpbp installed before heat exchanger for heating system as heat exchanger is not a dbl walled with leak detection unit..............ds
|
Final | 3/5/2008 | 3/5/2008 | 3/5/2008 | A | FAIL |
Daryl Spivey
|
|
|
re inspect need more info on heat exchanger plate........ds
|
Final | 3/3/2008 | 3/4/2008 | 3/4/2008 | A | FAIL |
Daryl Spivey
|
|
|
Home will be open.Please call Sylvan if we don''t get a green tag at ###-####. THANKS! Phone #: ###-#### Internet Inspection Request from: Steve Spence heat exchanger must be double walled with leak detector..............ds
|
Plumbing Rough-in | 9/28/2007 | 9/28/2007 | 9/28/2007 | P | PASS |
Daryl Spivey
|
|
|
Please call Sylvan if there is a problem with the plumbing. Thank you. Phone #: ###-#### Internet Inspection Request from: Steve Spence
|
Application received | | | 9/28/2007 | | DONE |
|
|
|
This permit was created on the web by Steve Spence
|