DOC - Permit Expired | 2/16/2010 | 2/16/2010 | 2/16/2010 | P | PASS |
Daryl Spivey
|
|
|
|
PLM-Aging Inspection | 2/16/2010 | 2/16/2010 | 2/16/2010 | | PASS |
Daryl Spivey
|
|
|
|
PLM-Aging Inspection | 12/15/2009 | 12/15/2009 | 12/15/2009 | | PASS |
Daryl Spivey
|
|
|
talked w/owner and still needs rpbp tested.will test in spring.........ds
|
Water and/or Sewer | 6/3/2008 | 6/3/2008 | 6/3/2008 | P | PART |
Eric Strole
|
|
|
needs to have rpba tested & certified & move blowout tee downstream of rpba.
|
Sprinkler (Final) | 6/3/2008 | 6/3/2008 | 6/3/2008 | P | CANC |
Eric Strole
|
|
|
dale Phone #: ###-####
|
Water and/or Sewer | 5/28/2008 | 5/29/2008 | 5/29/2008 | A | PART |
Eric Strole
|
|
|
jim Phone #: ###-####-need to disconnect well & hook up city water before meter is ordered. test from meter to point of tie in pass.
|
Water and/or Sewer | 5/20/2008 | 5/20/2008 | 5/20/2008 | P | PART |
Bill VanDegrift
|
|
|
ok to cover the service line from the meter to the house, the well disconnect will be at the house a sprinkler connection will be installed and the line tested.
|
Application received | | | 5/20/2008 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/20/2008 | | DONE |
|
|
|
|