Final | 11/25/2008 | 11/25/2008 | 11/25/2008 | P | PASS |
Jim Johnson
|
|
|
Levi McConnell is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Final | 11/24/2008 | 11/24/2008 | 11/24/2008 | P | PART |
Jim Johnson
|
|
|
Levi McConnell is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet need to have existing premise protection tested and certified for final oked temp
|
PLM-Aging Inspection | 11/14/2008 | 11/14/2008 | 11/14/2008 | | PASS |
Jim Johnson
|
|
|
under construction
|
Plumbing Rough-in | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | PASS |
Jim Johnson
|
|
|
Nate Sturlin is the field contact. He needs a final rough-in inspection. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
Plumbing Rough-in | 8/27/2008 | 8/28/2008 | 8/28/2008 | P | PART |
Jim Johnson
|
|
|
Nate Sturlin is the field contact. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet in wall rough-in on first floor rest room and breakroom sink,s and roof drain new piping ( need additional hangers) and second floor rest room,s and breakroom sink,s test ok still need to run vent,s up through roof
|
Plumbing Rough-in | 8/11/2008 | 8/12/2008 | 8/12/2008 | A | PART |
Jim Johnson
|
|
|
Andrew Norton is the field contact. Inspection for DWV Phone #: ###-#### Internet Inspection Request from: Heidi Mallet second floor men and women restroom,s rough-in test ok
|
Groundwork | 7/31/2008 | 7/31/2008 | 7/31/2008 | P | PART |
Jim Johnson
|
|
|
Nate Sturlin is the field contact. Please call Nate about 30mins prior to inspection so he can meet you there. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet first floor ground-work as noted on contractor plan,s test ok
|
Application received | | | 7/31/2008 | | DONE |
|
|
|
This permit was created on the web by Heidi Mallet
|
First Notice | 11/25/2008 | 11/25/2008 | | | |
Jim Johnson
|
|
|
|