Final | 2/29/2012 | 3/1/2012 | 3/1/2012 | A | PASS |
Daryl Spivey
|
|
|
JOB # 16032. Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes
|
Final | 2/28/2012 | 2/29/2012 | 2/29/2012 | P | PART |
Daryl Spivey
|
|
|
JOB # 16032. Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes
|
Final | 2/23/2012 | 2/24/2012 | 2/24/2012 | P | FAIL |
Daryl Spivey
|
|
|
JOB # 16032. Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes W/H t&p needs repiped, steamer requires an rpbp installed and lav and claw foot need to be installed and working with a legal airgap faucet on tub.........ds
|
PLM-Aging Inspection | 2/21/2012 | 2/21/2012 | 2/21/2012 | | PASS |
Daryl Spivey
|
|
|
wip
|
Plumbing Rough-in | 11/22/2011 | 11/23/2011 | 11/23/2011 | A | CANC |
Daryl Spivey
|
|
|
JOB # 16032 Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes
|
Plumbing Rough-in | 11/22/2011 | 11/22/2011 | 11/22/2011 | P | PASS |
Daryl Spivey
|
|
|
shilo
|
Plumbing Rough-in | 11/18/2011 | 11/21/2011 | 11/21/2011 | P | FAIL |
Jim Johnson
|
|
|
JOB # 16032. Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes 1. test failed on D W V in master bath area need to retest 2. need to lower copper steam supply line and provide tenting over pipe in over head for rough-in and re-pipe copper around electrical box in wall 3. as per table 7-3 need to provide a two inch minimum drain on kitchen sink 4. need to provide a cleanout on kitchen sink drain line contractor to recall when ready
|
Groundwork | 9/21/2011 | 9/22/2011 | 9/22/2011 | A | PASS |
Daryl Spivey
|
|
|
JOB # 16032. Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes
|
Application received | | | 9/16/2011 | | DONE |
|
|
|
This permit was created on the web by Ann Marie Reyes
|