First Notice | 8/16/2013 | 8/16/2013 | 12/2/2013 | | DONE |
Eric Strole
|
|
|
|
Final | 8/15/2013 | 8/16/2013 | 8/16/2013 | P | PASS |
Eric Strole
|
|
|
|
Final | 8/15/2013 | 8/15/2013 | 8/15/2013 | P | NR |
Eric Strole
|
|
|
please call Doran with any questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige
|
Final | 8/1/2013 | 8/5/2013 | 8/5/2013 | P | PART |
Eric Strole
|
|
|
please call nate with any questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige-Need to isolate inside hose-bib with an rpba and label non-potable do not drink.Need tempered water to all wash basins. Temp final ok.
|
Final | 8/5/2013 | 8/5/2013 | 8/5/2013 | P | CANC |
Eric Strole
|
|
|
|
Other | 8/1/2013 | 8/5/2013 | 8/5/2013 | A | CANC |
Eric Strole
|
|
|
this is a backflow inspection Phone #: ###-#### >> Inspection requested via web by Nicholas Paige
|
Plumbing Rough-in | 7/3/2013 | 7/8/2013 | 7/8/2013 | A | PASS |
Bill VanDegrift
|
|
|
pleas call nate with any questions.
Thanks Phone #: ###-#### >> Inspection requested via web by Nicholas Paige shop restrooms , breakroom and roof drains ok
|
Plumbing Rough-in | 7/1/2013 | 7/1/2013 | 7/1/2013 | P | PART |
Eric Strole
|
|
|
Please call Nate Kafka ###-#### Need for 1 pm if at all possible. >> Inspection requested via web by Nicholas Paige-truck stop and lobby ok to cover.
|
Roof Drains | 6/6/2013 | 6/6/2013 | 6/6/2013 | P | NR |
Eric Strole
|
|
|
|
Groundwork | 6/5/2013 | 6/6/2013 | 6/6/2013 | A | PASS |
Eric Strole
|
|
|
please call doran with any questions or concerns Phone #: ###-#### >> Inspection requested via web by Nicholas Paige-dwv in ground pass, still need roof drains.
|
Groundwork | 5/24/2013 | 5/24/2013 | 5/24/2013 | P | PART |
Eric Strole
|
|
|
please call Doran with any questions Phone #: ###-#### >> Inspection requested via web by Nicholas Paige-this was for the vents on interceptors.
|
Other | 5/21/2013 | 5/21/2013 | 5/21/2013 | P | NR |
Bill VanDegrift
|
|
|
clint -conf only Phone #: ###-#### site contracter needs their own permit
|
Water and/or Sewer | 4/29/2013 | 4/30/2013 | 4/30/2013 | A | CANC |
Eric Strole
|
|
|
|
Groundwork | 4/29/2013 | 4/29/2013 | 4/29/2013 | P | PEND |
Eric Strole
|
|
|
Need contractor who installed interceptors to pull permit.
|
Groundwork | 3/25/2013 | 3/25/2013 | 3/25/2013 | P | PART |
Eric Strole
|
|
|
please call Brandon with any questions!
thanks, Phone #: ###-#### >> Inspection requested via web by Nicholas -partial g/w
|
Issue PAID IN FULL permit | | | 3/25/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 3/25/2013 | | DONE |
|
|
|
This permit was created on the web by Nicholas Paige
|