Water Heater Final | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | PASS |
Dan Ediger
|
|
|
Brian Phone #: ###-####
|
Water Heater Final | 1/4/2018 | 1/5/2018 | 1/5/2018 | A | FAIL |
Dan Ediger
|
|
|
Please call Don when inspector is on way Phone #: ###-#### Inspection requested via web by Brian Hughes. Add fire collar to the flue at the ceiling. Add a pipe bollard in front of the water heater.
|
Issue PAID IN FULL permit | | | 1/4/2018 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 1/4/2018 | | DONE |
|
|
|
This permit was created on the web by Brian Hughes
|