Inspections for the day of: Wednesday, March 22, 2000.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00105 BLD-Framing/Rough-in3/21/20003/22/20003/22/2000 12:00:00 AMAPART
###-#### Shear ok 3/22/00 12:59:49 PM
BLD00-00107 BLD-Final3/21/20003/22/20003/22/2000 12:00:00 AMAFAIL
dave ###-#### fn occ Need fire final ok 3/22/00 1:00:04 PM
BLD00-00329 BLD-Framing/Rough-in3/21/20003/22/20003/22/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 03/21/2000 at 14:34:15. Contact: ###-####. Shear ok 3/22/00 1:00:10 PM
BLD00-00469 BLD-Framing/Rough-in3/21/20003/22/20003/22/2000 12:00:00 AMAPART
###-#### Shear ok 3/22/00 1:00:15 PM
BLD00-00446 BLD-Framing/Rough-in3/21/20003/22/20003/22/2000 12:00:00 AMAPART
###-#### Shear ok 3/22/00 12:59:56 PM
BLD00-00658 BLD-Footing3/22/20003/22/20003/22/2000 12:00:00 AMPPASS
###-#### Mono pour...ok. 3/23/00 9:04:41 AM
BLD00-00361 BLD-Framing/Rough-in3/22/20003/22/20003/22/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/22/2000 at 08:49:26. Contact: ###-####. Shear ok. 3/23/00 9:04:05 AM
BLD00-00742 BLD-Framing/Rough-in3/22/20003/22/20003/22/2000 12:00:00 AMPPASS
doug ###-#### Swimming pool rebar appears ok. 3/23/00 9:03:59 AM
BLD00-00152 BLD-Framing/Rough-in3/22/20003/22/20003/22/2000 12:00:00 AMPFAIL
steve ###-#### C/N...truss bracing, insp. F/P, blocking. 3/23/00 9:04:32 AM
BLD00-00107 BLD-Final3/22/20003/22/20003/22/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 03/22/2000 at 10:48:13. Contact: ###-####. NR 3/23/00 9:04:12 AM
BLD00-00531 BLD-Footing3/22/20003/22/20003/22/2000 12:00:00 AMPPASS
###-####