ELE08-01006
| Electrical Rough-In | 4/22/2008 | 4/22/2008 | 4/22/2008 5:08:02 PM | P | PASS |
|
|
access from rear of unit by pool first door south of meter bank and phone demark, back door open bath on left and plywood blocking hole in wall for lift pump in crawl Phone #: ###-#### Internet Inspection Request from: Shane Vigil
|
ELE08-00026
| Electrical Rough-In | 4/22/2008 | 4/22/2008 | 4/22/2008 4:14:27 PM | P | FAIL |
|
|
kenneth Phone #: ###-#### box fill and protection
|
ELE08-00309
| Final | 4/22/2008 | 4/22/2008 | 4/22/2008 3:26:01 PM | P | PART |
|
|
Please make this as late in the day as possible I would appreciate it. Phone #: ###-#### Internet Inspection Request from: Ryan Christensen finish grounding make directory spacific and seal coolers. signed T/O
|
ELE08-00716
| Final | 4/22/2008 | 4/22/2008 | 4/22/2008 2:26:46 PM | P | NR |
|
|
Partial final for occupancy Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton
|
ELE08-00716
| Conference | 4/22/2008 | 4/22/2008 | 4/22/2008 2:26:35 PM | P | PART |
|
|
Partial final for occupancy Phone #: ###-#### Internet Inspection Request from: Kerri Hamilton had conf about listing of furnishings and work bench. also requirements for T/O
|
ELE08-01003
| Temporary Service | 4/22/2008 | 4/22/2008 | 4/22/2008 1:25:23 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS expose ground rod, connect GEC to Neutral bus, and install a connector on GEC
|
ELE08-00754
| Electrical Rough-In | 4/22/2008 | 4/22/2008 | 4/22/2008 1:05:00 PM | P | PART |
|
|
jared Phone #: ###-#### grid ok
|
ELE08-00999
| Electrical Rough-In | 4/22/2008 | 4/22/2008 | 4/22/2008 11:58:08 AM | A | PART |
|
|
SUITE 301.... WALLS ONLY PLEASE Phone #: ###-#### Internet Inspection Request from: Bob Glenn Walls ok
|
ELE08-00981
| Temporary Service | 4/18/2008 | 4/22/2008 | 4/22/2008 10:57:11 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Alan Lusk T/s U/G Ok
|
ELE08-00996
| Electrical Rough-In | 4/21/2008 | 4/22/2008 | 4/22/2008 10:28:28 AM | A | PASS |
|
|
We wired booster transformers for 3 separate pieces of existing equipment. Please call Dan with 30 minutes heads-up notice to meet you for access and tour.Thank You !!! Dan. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell
|
ELE08-00996
| DOC - Permit Finaled | 4/22/2008 | 4/22/2008 | 4/22/2008 10:28:20 AM | P | PASS |
|
|
|
ELE08-00989
| Final | 4/21/2008 | 4/22/2008 | 4/22/2008 9:25:45 AM | A | FAIL |
|
|
Randy ###-#### Phone #: ###-#### Internet Inspection Request from: Randy Fletcher isolate neutral and run indivual neutrals with each circuit to point of origin of each circuit.
|
ELE08-00556
| Final | 4/21/2008 | 4/22/2008 | 4/22/2008 8:37:46 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Jari Rivers
|