BLD02-01584
| BLD-Final | 5/12/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 5/12/2003 at 11:56:21 AM. Contact: ###-####. Need all required signatures prior to structual. Reviewed necessary sign offs with contractor. Will re-call. 5/13/2003 2:17:03 PM
|
MEC03-00740
| Pressure Test | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | FAIL |
|
|
###-#### C/N posted in kitchen-Under 5 lbs on guage at time of inspection. 5/13/2003 1:23:19 PM
|
MEC03-01206
| Pressure Test | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | PASS |
|
|
|
BLD03-00612
| BLD-Framing/Rough-in | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | PASS |
|
|
###-#### Ok to insulate 5/13/2003 3:32:01 PM
|
MEC03-01186
| Rough-in | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC03-01186
| Pressure Test | 5/13/2003 | 5/13/2003 | 5/13/2003 12:00:00 AM | P | DONE |
|
|
Already passed by Ins. 411 on 5/12/03--Gas pipe has tag. 5/13/2003 3:32:44 PM
|