BLD00-03627
| BLD-Framing/Rough-in | 8/22/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PASS |
|
|
###-#### ted please call before 10
conf. only w/ ted, garage fire wall and ceiling, ok w/ one layer 5/8 in garage w/ rated doors, all sealed per plans will be ok 8/24/2001 11:44:30 AM
|
BLD01-01990
| BLD-Concrete | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PART |
|
|
clay ###-####
basement walls ok 8/24/2001 11:27:58 AM
|
BLD01-00846
| BLD-Framing/Rough-in | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/23/2001 at 13:39:15. Contact: ###-####.duplex only,,c/n posted, ok to insulate pending mech. rouph pass 8/24/2001 11:13:17 AM
|
BLD01-01014
| BLD-Foundation | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/23/2001 at 15:22:05. Contact: ###-####.pending si report 8/24/2001 11:55:31 AM
|
BLD01-01372
| BLD-Framing/Rough-in | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/23/2001 at 19:42:52. Contact: ###-####.ext. shear ok on east and west side 8/24/2001 10:28:48 AM
|
BLD00-03185
| BLD-Conference | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | A | CANC |
|
|
|
BLD01-00187
| BLD-Framing/Rough-in | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/23/2001 at 17:32:14. Contact: ###-####.no mech. sign off, and need to meet arch. or strutural on job, go over special construction design 8/24/2001 2:50:35 PM
|
BLD01-00171
| BLD-Framing/Rough-in | 8/24/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 07:57:22. Contact: ###-####.
interior steel headers between new and old ok pending eng. letter on bolts and s.i. on welds, ok to cover after welding inspection 8/24/2001 4:14:16 PM
|
BLD01-00747
| BLD-Other | 8/24/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/24/2001 at 08:43:06. Contact: ###-####.center masonary wall, 2nd lift, ok to grout 8/24/2001 4:30:24 PM
|
BLD01-02142
| BLD-Framing/Rough-in | 8/24/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | P | PART |
|
|
###-####
ext. shear ok w/ verbal corrections 8/24/2001 4:11:49 PM
|
BLD01-01056
| BLD-Concrete | 8/24/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | P | PART |
|
|
###-#### wayne
already grouted, pending s. i. report 8/24/2001 4:15:03 PM
|
BLD01-01609
| BLD-Framing/Rough-in | 8/24/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | P | PART |
|
|
###-#### dave
c/n posted, ok to insulate unaffected areas 8/24/2001 3:28:44 PM
|
BLD01-01612
| BLD-Framing/Rough-in | 8/23/2001 | 8/24/2001 | 8/24/2001 12:00:00 AM | P | PASS |
|
|
REX- ###-#### FR
energy code ok also, need to clarify address by final. 8/24/2001 3:02:03 PM
|