Inspections for the day of: Friday, August 24, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-03627 BLD-Framing/Rough-in8/22/20018/24/20018/24/2001 12:00:00 AMAPASS
###-#### ted please call before 10
conf. only w/ ted, garage fire wall and ceiling, ok w/ one layer 5/8 in garage w/ rated doors, all sealed per plans will be ok 8/24/2001 11:44:30 AM
BLD01-01990 BLD-Concrete8/23/20018/24/20018/24/2001 12:00:00 AMAPART
clay ###-####
basement walls ok 8/24/2001 11:27:58 AM
BLD01-00846 BLD-Framing/Rough-in8/23/20018/24/20018/24/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/23/2001 at 13:39:15. Contact: ###-####.duplex only,,c/n posted, ok to insulate pending mech. rouph pass 8/24/2001 11:13:17 AM
BLD01-01014 BLD-Foundation8/23/20018/24/20018/24/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/23/2001 at 15:22:05. Contact: ###-####.pending si report 8/24/2001 11:55:31 AM
BLD01-01372 BLD-Framing/Rough-in8/23/20018/24/20018/24/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/23/2001 at 19:42:52. Contact: ###-####.ext. shear ok on east and west side 8/24/2001 10:28:48 AM
BLD00-03185 BLD-Conference8/23/20018/24/20018/24/2001 12:00:00 AMACANC
BLD01-00187 BLD-Framing/Rough-in8/23/20018/24/20018/24/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/23/2001 at 17:32:14. Contact: ###-####.no mech. sign off, and need to meet arch. or strutural on job, go over special construction design 8/24/2001 2:50:35 PM
BLD01-00171 BLD-Framing/Rough-in8/24/20018/24/20018/24/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/24/2001 at 07:57:22. Contact: ###-####.
interior steel headers between new and old ok pending eng. letter on bolts and s.i. on welds, ok to cover after welding inspection 8/24/2001 4:14:16 PM
BLD01-00747 BLD-Other8/24/20018/24/20018/24/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/24/2001 at 08:43:06. Contact: ###-####.center masonary wall, 2nd lift, ok to grout 8/24/2001 4:30:24 PM
BLD01-02142 BLD-Framing/Rough-in8/24/20018/24/20018/24/2001 12:00:00 AMPPART
###-####
ext. shear ok w/ verbal corrections 8/24/2001 4:11:49 PM
BLD01-01056 BLD-Concrete8/24/20018/24/20018/24/2001 12:00:00 AMPPART
###-#### wayne
already grouted, pending s. i. report 8/24/2001 4:15:03 PM
BLD01-01609 BLD-Framing/Rough-in8/24/20018/24/20018/24/2001 12:00:00 AMPPART
###-#### dave
c/n posted, ok to insulate unaffected areas 8/24/2001 3:28:44 PM
BLD01-01612 BLD-Framing/Rough-in8/23/20018/24/20018/24/2001 12:00:00 AMPPASS
REX- ###-#### FR
energy code ok also, need to clarify address by final. 8/24/2001 3:02:03 PM