Final | 10/8/2003 | 10/9/2003 | 10/9/2003 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 10/8/2003 at 11:43:46 AM. Contact: ###-####.
|
Final | 12/2/2002 | 12/2/2002 | 12/2/2002 | P | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/02/2002 at 09:32:06. Contact: . Verbal to workers....Prot osts, Install hood, check boots and duct off? 12/2/2002 12:24:28 PM
|
Rough-in | 9/20/2002 | 9/20/2002 | 9/20/2002 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/20/2002 at 09:51:10. Contact: ###-####. P/T OK. 9/20/2002 3:19:00 PM
|