Permit Information
Permit NumberBLD11-00179
StatusFinaled
Name SCOTT HEDRICK CONSTRUCTION
Site Address 514 S 12TH ST
Project Name12th & River Senior Apartments
Customer Number 
ePlanReviewNo
Description
(12th & River Senior Apartments) To construct a three story, 53 unit, senior apartment housing with enclosed parking and associated amenities, a total area of 60,279 sq. ft. (1st - 22,940 sf / 2nd - 18,737 sf / 3rd - 18,602 sf). There are 52 units of 614 sf and one unit of 772 sf. There are three Type 'A' Accessible units and 50 Type 'B' Accessible units. Building is wood frame non-rated construction, fully sprinklered with NFPA 13 system; 1/2 hour fire-resistive fire partitions for corridor wall & corridor lid construction; walls between sleeping units / dwelling units shall be 1/2 hour fire-resistive fire partitions; 1/2 hour horizontal fire-resistive assembly between units and bewteen other occupancies unless a full 1-hour assembly is required to separate mixed use occupancies; 1-hour fire-resistive fire barrier walls and 1-hour fire-resistive horizontal assemblies between mixed use occupancies of "A" & "R" and "R" & "S2" (sheet A0.1) and at stair enclosure separation. Electrical, mechanical, plumbing, fire sprinkler and alarm systems; interior finishes and millwork in accordance with reviewed plans and all attached plan reviews and red-lined comments of all reviewing agencies. drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice 8/10/20128/6/2012 DONE
Print Statement  8/6/2012 DONE
DetailsTisha Gallop
e-mailed to Scott Hedrick and sent paper statement to owner per Scott's request at: Boise Senior 202 LP, 540 N. Eagle Rd #117, Eagle, ID 83616.
First Notice 7/10/20127/31/2012 DONE
e-mailed to Scott Hedrick
BLD-Final7/16/20127/16/20127/16/2012PPASS
DetailsDave Hannah
Phone #: ###-#### >> Inspection requested via web by Gary Simon
FIRE-Final Inspection7/13/20127/16/20127/16/2012PPASS
DetailsForrest France
FIRE-Final Inspection7/13/20127/16/20127/16/2012APASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
Permanent Occupancy  7/16/2012 DONE
DetailsBarbara Stitt
FIRE-Final Inspection7/13/20127/13/20127/13/2012PCANC
DetailsTroy Cobbley
Overbooked due to inspection load. Contractor notified.
FIRE-Final Inspection7/11/20127/13/20127/13/2012ACANC
DetailsTroy Cobbley
Duplicate inspection
FIRE-Final Inspection7/11/20127/12/20127/12/2012PNR
DetailsForrest France
Gary ###-#### >> Inspection requested via web by Gary Simon
Zoning Approval7/12/20127/12/20127/12/2012 PASS
DetailsJosh Wilson
PubWorks Occupancy Approval7/3/20127/3/20127/3/2012 DONE
DetailsTiffany Lowery
BLD-Wall cover6/7/20126/7/20126/7/2012PPASS
DetailsDave Hannah
Dave, you are going to be looking at the rockwool at the last window. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other5/23/20125/24/20125/25/2012APASS
DetailsDave Hannah
Dave, this is the rockwool at the 2nd and 3rd floors. As early as possible Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other5/22/20125/22/20125/24/2012PPASS
DetailsDave Hannah
Cover - ceilings Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other5/22/20125/23/20125/23/2012PPASS
DetailsDave Hannah
Ceiling cover in the garage. Early pm if possible. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Other5/15/20125/15/20125/15/2012PPASS
DetailsMike Jordan
Soffit cover 1st floor. Phone #: ###-#### >> Inspection requested via web by Gary Simon
FIRE-Sprinkler Rough-in5/14/20125/14/20125/14/2012PPART
DetailsForrest France
Fire sprinkler work at the 1st floor common area soffits okayed for cover.
BLD-Other5/10/20125/11/20125/11/2012APART
DetailsMike Jordan
Soffit inspection 1st floor Phone #: ###-#### >> Inspection requested via web by Gary Simon. North and south portions, coridor area not ready. All fire stop and column encasement ok at soffit.
BLD-Other5/2/20125/3/20125/4/2012PPASS
DetailsDave Hannah
Ceiling cover of soffits. Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to cover soffits third floor west side
BLD-Framing/Rough-in4/26/20124/27/20124/27/2012APART
DetailsDave Hannah
Dave, we are inspecting the garage ceiling. Phone #: ###-#### >> Inspection requested via web by Gary Simon east third ok to cover
BLD-Energy code compliance4/17/20124/18/20124/20/2012APASS
DetailsDave Hannah
Dave, I need you to look at one more exterior wall. Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to cover ceiling in north stair tower sheet rocking go good and insulation also ok
BLD-Framing/Rough-in4/11/20124/11/20124/12/2012PPART
DetailsDave Hannah
Dave, just wanted you to look at double layers of drywall on ceilings. Phone #: ###-#### >> Inspection requested via web by Gary Simon all looks goog
BLD-Final4/11/20124/11/20124/11/2012PCANC
DetailsDave Hannah
Dave, just wanted you to look at double layers of drywall on ceilings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Framing/Rough-in4/5/20124/6/20124/6/2012APART
DetailsDave Hannah
Dave, I need this as early as possible.

Thanks, Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to insulate first floor common area
BLD-Framing/Rough-in4/5/20124/5/20124/5/2012PPART
DetailsDave Hannah
We need an inspection for the Community room. Phone #: ###-#### >> Inspection requested via web by Gary Simon 1hr ceiling ok
BLD-Framing/Rough-in3/28/20123/28/20123/28/2012PPART
DetailsDave Hannah
Dave, I am a little unsure were we are at on the 3rd floor west wing. I thought we were approved to cover but we will look at it just in case. Phone #: ###-#### >> Inspection requested via web by Gary Simon ok to cover secon and third floor south wing rooms and corridor
Case Summary (BLD)  3/28/2012 DONE
BLD-Energy code compliance3/14/20123/15/20123/16/2012APASS
DetailsDave Hannah
Dave, late morning if possible. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Conference3/13/20123/14/20123/14/2012APART
DetailsDave Hannah
Dave, if mid-morning Phone #: ###-#### >> Inspection requested via web by Gary Simon int side of two sided shear walls first floor north half ok to cover
BLD-Framing/Rough-in3/13/20123/13/20123/14/2012PPART
DetailsDave Hannah
Dave, I need you to look at some shear walls we missed. Phone #: ###-#### >> Inspection requested via web by Gary Simon
CHANGE STATUS TO (ISS)  3/7/2012 DONE
DetailsBarbara Stitt
Issue plan modification
(F) Reprint permit  3/7/2012 DONE
DetailsBarbara Stitt
BLD-Framing/Rough-in3/5/20123/5/20123/6/2012PPART
DetailsDave Hannah
gary Phone #: ###-#### ok to cover second floor both ends ok to insulate third floor walls and ceiling
Plan assigned to (DRS)9/16/20119/16/20112/28/2012 PASS
DetailsDan Stuart
Routing - PLAN CHECK9/22/2012 2/28/2012 PASS
DetailsDan Stuart
Received copy of U.L. Design No. M512 for use of Greenfiber Cellulose Cacoon2 Stabilized full depth spray in 18" "I" joists and copy of STC Rating of 53 for the noted assembly.
PLANS/APPL TAKEN TO FRONT DESK  2/28/2012 PASS
Print Occupancy Form  2/28/2012 DONE
Telephone call  2/28/2012 DONE
DetailsChristina Prado
Called and gave Joe fees due and advised Plan Mod is ready for pick up
Override - Parcel Holds  2/28/2012  
Permit Ready to Issue  2/28/2012 DONE
DetailsChristina Prado
Plan mod complete
BLD-Framing/Rough-in2/27/20122/27/20122/27/2012PPART
DetailsDave Hannah
gary Phone #: ###-#### ok to insulate second floorsouth end
BLD-Framing/Rough-in2/22/20122/23/20122/24/2012APART
DetailsDave Hannah
gary Phone #: ###-#### second floor south end ok to insulate ext wall and ceiling of corridor
BLD-Framing/Rough-in2/21/20122/21/20122/21/2012PPART
DetailsDave Hannah
Gary ###-#### second floor south half needs more work finashed
Override - Parcel Holds  2/21/2012  
BLD-Other2/17/20122/17/20122/17/2012PPART
DetailsJim Storey
Gary per Gary this inspection has nothing to do with the plan mod... Phone #: ###-#### 2nd floor duct fire blk at fur out ok east wing.
BLD-Framing/Rough-in2/13/20122/13/20122/14/2012PPART
DetailsDave Hannah
gary Phone #: ###-#### if possible please make it later. per gary this has nothing to do with the plan mod. first floor north half romms ok to cover walls
BLD-Framing/Rough-in2/8/20122/9/20122/9/2012ANR
DetailsDave Hannah
Gary-- ###-####
BLD-Other2/6/20122/6/20122/9/2012PPEND
DetailsDave Hannah
gary - fire wall Phone #: ###-#### this is on kitchen range ducts need to talk with engineer and dan
Override - Parcel Holds  2/8/2012  
BLD-Other1/26/20121/27/20121/27/2012APART
DetailsDave Hannah
Fire wall --- Gary ###-#### lids in piping chases ok to finish
BLD-Conference1/25/20121/25/20121/27/2012PPASS
DetailsDave Hannah
Please call prior to get other sub out on site in time -- Gary ###-####
Override - Parcel Holds  1/26/2012  
Override - Parcel Holds  1/25/2012  
BLD-Other1/17/20121/17/20121/19/2012PPASS
DetailsDave Hannah
gary - rough nailing Phone #: ###-####
BLD-Other1/13/20121/13/20121/13/2012PPASS
DetailsTom Arcoraci
rough shear nailing//Gary Phone #: ###-####
BLD-Other1/12/20121/13/20121/13/2012APART
DetailsMike Jordan
gary - rough shear nailing Phone #: ###-####. Roof shear nailing from gridline 20 west to edge of building between grids A to E. Nailing ok, work in progress on installing straps.
BLD-Other1/6/20121/9/20121/10/2012APART
DetailsDave Hannah
gary - fire proofing Phone #: ###-#### frist and second floor corradors north wing ok
BLD-Framing/Rough-in1/5/20121/6/20121/6/2012PPART
DetailsDave Hannah
gary - early as possible please Phone #: ###-#### int shear ho;d downs floor to floor ok on north half
BLD-Other1/4/20121/5/20121/5/2012APART
DetailsDave Hannah
shear wall insp//Gary Phone #: ###-#### sheetrock on fire wall west end second floor ok
BLD-Other12/29/201112/30/201112/30/2011APASS
DetailsDave Hannah
rich - shear wall Phone #: ###-####rest of the bldg ok to cover but need to check strapes
BLD-Conference12/27/201112/27/201112/29/2011PPART
DetailsDave Hannah
Please call prior so meeting can be set up---Gary ###-#### talked about shafts
Override - Parcel Holds  12/27/2011  
BLD-Other12/22/201112/22/201112/23/2011PPART
DetailsDave Hannah
gary - ###-#### - shear wall sheetrock on third floor south wall ok to cover
BLD-Other12/20/201112/21/201112/22/2011PPART
DetailsDave Hannah
Early as possible///Shear nailing---Gary ###-#### second floor south wall ok to sheetrock also corrador lids first and second floor north side
Override - Parcel Holds  12/22/2011  
BLD-Other12/19/201112/20/201112/20/2011APART
DetailsDave Hannah
shear wall//Gary Phone #: ###-#### see on site plans for location
Override - Parcel Holds  12/20/2011  
BLD-Framing/Rough-in12/13/201112/14/201112/15/2011PPART
DetailsDave Hannah
early pm please///Gary Phone #: ###-#### looked at roof nailing
BLD-Conference12/9/201112/12/201112/12/2011PPASS
DetailsDave Hannah
Gary Phone #: ###-####
BLD-Framing/Rough-in12/6/201112/7/201112/7/2011APART
DetailsDave Hannah
Sheer nailing inspection///Gary ###-#### roof nailing east section
Override - Parcel Holds  12/6/2011  
BLD-Other11/29/201111/29/201111/29/2011PPART
DetailsDave Hannah
shear wall insp...Gary Phone #: ###-#### third floor north half ok to cover ext
BLD-Other11/9/201111/9/201111/9/2011PPART
DetailsDave Hannah
###-#### - gary - shear nailing inspection first floor and second floor and conc deck first section ok
Override - Parcel Holds  11/9/2011  
BLD-Other10/31/201110/31/201110/31/2011APART
DetailsDave Hannah
mike - ###-#### - - parking garage inspection slab on grade spec inspection will be on site @ 7:00 am pour
Override - Parcel Holds  10/31/2011  
BLD-Other10/7/201110/10/201110/11/2011ACANC
DetailsDave Hannah
Rebar/special inspection by strata-- Gary ###-####
BLD-Concrete10/10/201110/11/201110/11/2011APASS
DetailsDave Hannah
gary - ###-#### - masonary - special inspection by Strata
Override - Parcel Holds  10/10/2011  
BLD-Concrete10/7/201110/7/201110/7/2011PPART
DetailsJim Storey
Special inspecial inspection by Strata-re-bar inspection-Gary Phone #: ###-#### si pending report
Override - Parcel Holds  10/7/2011  
BLD-Other10/3/201110/4/201110/4/2011APART
DetailsDave Hannah
Rebar---Gary ###-#### second level of cmu grouting ok to grout
Override - Parcel Holds  10/3/2011  
BLD-Other9/28/20119/29/20119/30/2011APART
DetailsDave Hannah
gary - ###-#### - masonary -special inspection will take place first lift cmu ok
Override - Parcel Holds  9/28/2011  
Plan resubmittals requested  9/23/2011 DONE
Phone conversation with Joe Swinford reviewing the information he had e-mailed me. The data does not address requirements for a specific "I" joist assembly as is being used for this project using cellulose insulation. Joe will continue to search for listed assembly for "I" joists for submittal. Joe to review with Jim Glancey for assembly components of UL system L582 for fully insulated 1-hour assembly for the truss roof portion of project. If construction & components comply, the assembly will meet what is being proposed for full cavity cellulose insulation for that portion.
BLD-Conference9/16/20119/20/20119/22/2011PPASS
DetailsDave Hannah
Inspection for slab rebar and vapor barrier. Phone #: ###-#### >> Inspection requested via web by Gary Simon
Routing - PLAN CHECK9/16/2011 9/22/2011 FAIL
DetailsDan Stuart
Reviewed e-mails and attachments regarding use of cellulose in floor/ceiling fire-resistive assemblies received from Joe Swinford, project product rep. The UL wall assemblies, u305, u309, u341 & u356 all allow the use of US Greenfiber cellulose in the assemblies and would work. A specific approval for use of cellulose in an "I" joist assembly has not been found and is stll required. Assembly UL L582 appears that it would work for the truss type floor or roof system if the trusses and components are as stated in the specific listing, for a full depth cellulose insulation application. Joe will keep looking for an "I" joist listed assembly.
Plan Modification Accepted  9/16/2011 DONE
DetailsChristina Prado
PLAN MOD---two sheets of plan A-5.1 received as well as one copy of insulation specs. Plans given to Dan Stuart for review
BLD-Concrete9/12/20119/15/20119/15/2011PPASS
DetailsJim Storey
We will be placing concrete for a portion of the slab on Friday. morning. We have the rebar mat and the vapor barrior in place. Phone #: ###-#### >> Inspection requested via web by Gary Simon nw slab ok
BLD-Footing9/14/20119/15/20119/15/2011APASS
DetailsJim Storey
We are placing concrete for the column footings in the garage area. Strata will be onsite for rebar inspetion and concrete testing. Phone #: ###-#### >> Inspection requested via web by Gary Simon placed w/si
BLD-Other9/12/20119/12/20119/13/2011PPASS
DetailsDave Hannah
We need a inspection on the vapor barrier for our 1st slab pour. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Foundation9/1/20119/6/20119/12/2011PPART
DetailsDave Hannah
We are finishing up the remainder of the stemwalls. Strata will be onsite for the special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/30/20118/31/20119/1/2011PDEFR
DetailsDave Hannah
Placing concrete for ftgs. (1:00pm) Strata to be onsite for special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/29/20118/30/20118/31/2011APART
DetailsDave Hannah
We are pouring footing tomorrow 9:00am Strata will be doing special inspections & Concrete cylinders

MB >> Inspection requested via web by Mike Burden
BLD-Footing8/23/20118/23/20118/24/2011APART
DetailsDave Hannah
Placing concrete in interior footings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/23/20118/24/20118/24/2011APART
DetailsDave Hannah
We are placing concrete for interior footings. Strata will be onsite for special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Foundation8/23/20118/24/20118/24/2011PPART
DetailsDave Hannah
Stemwall pour at 1:00pm Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Foundation8/19/20118/22/20118/23/2011PPART
DetailsDave Hannah
Pouring stemwalls and footings. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/18/20118/19/20118/23/2011APART
DetailsDave Hannah
We are pouring footings at 10:00 am Strata will be doing special inspection and taking concrete cylinders Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Foundation8/17/20118/18/20118/19/2011PPASS
DetailsDave Hannah
Placing concrete for foundation and ftgs. Strata will do special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Footing8/16/20118/17/20118/18/2011PPART
DetailsDave Hannah
We are pouring misc. footings and stemwalls at 1:00pm. Phone #: ###-#### >> Inspection requested via web by Gary Simon
BLD-Conference8/15/20118/16/20118/18/2011PPART
DetailsDave Hannah
We are pouring footings tomorrow at 12:00 noon Strata will do special inspections and take cylinders

Thanks MB Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Conference8/12/20118/15/20118/16/2011APASS
DetailsDave Hannah
We are pouring walls at 10:00 am Strata will be doing Special inspections Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Conference8/10/20118/12/20118/16/2011APASS
DetailsDave Hannah
We are going to pour walls at elevator and main building 9:00am. Strata will do special inspections and cylinders

MB Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Conference8/9/20118/10/20118/10/2011PPART
DetailsDave Hannah
We are pouring 2ea elevator bases tomorrow at 1:00
Strata will be doing special inspections Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Conference8/8/20118/9/20118/9/2011PDEFR
DetailsDave Hannah
We are pouring additional walls at 1:00 Strata will be doing special inspections Phone #: ###-#### >> Inspection requested via web by Mike Burden
BLD-Footing8/3/20118/4/20118/4/2011APART
DetailsTony Young
We are placing concrete at 9:00am. Strata will be onsite for a special inspection. Phone #: ###-#### >> Inspection requested via web by Gary Simon,,, pending special inspection report
Issue PAID IN FULL permit  7/6/2011 DONE
Telephone call  7/5/2011 DONE
DetailsBarbara Stitt
Called Justin Wall and informed him that the fees were paid and that all we were waiting on was the informatin from ACHD///7-5-11 @ 10:10am
Telephone call  7/5/2011 DONE
DetailsBarbara Stitt
Called Justin Wall and informed him that all the information is here and that someone can come pick up the permit///7-5-11 @2:30pm
Plan resubmittals received  5/27/2011 DONE
DetailsTisha Gallop
Received two copies of plan sheets E-2.0L, E-2.1L, E-2.2L; given to Ron Hill.
Routing - PUBLIC WORKS5/27/2011 5/27/2011 PASS
DetailsConnie Baumgartner
Routing - PLAN CHECK5/27/2011 5/27/2011 PASS
DetailsDan Stuart
Jason Signed off plans.
PLANS/APPL TAKEN TO FRONT DESK  5/27/2011 DONE
Print Occupancy Form  5/27/2011 DONE
DetailsTisha Gallop
Telephone call  5/27/2011 DONE
DetailsTisha Gallop
called Justin Wall/arch rep. and Scott Hedrick Construction and left vm at both places that permit is ready, fees and need ACHD.
Permit Ready to Issue  5/27/2011 DONE
DetailsTisha Gallop
Plan assigned to (DRS)1/31/2011 5/27/2011 PASS
DetailsDan Stuart
Routing - PLAN CHECK3/11/2011 5/26/2011 PASS
DetailsDan Stuart
Inserted new Structural sheets and attached new structural calculations and resubmitted ESC Sheets. Plans passed review based on conditions and attachments to plans and as agreed by Ron Hill project manager to insert final electrical sheets to be submitted on 5/27/11.
Plan resubmittals received  5/26/2011 DONE
DetailsTisha Gallop
received two copies of structural calcs, and plan sheets S4.0, S4.1, S5.1, S6.0, S7.0, S8.0, S8.1; taken to Ron Hill.
Routing Off Site - STRUCTURAL5/26/2011 5/26/2011 PASS
DetailsDan Stuart
E-mailed PDF resubmittal response to Structural Plan Review #3. Received confirmation from Steve Call that Strucutral plan Review items appeared to be addressed.
Telephone call  5/25/2011 DONE
Talked with Sarah McClendon, Project Strucutral Engineer, concerning PDF documents e-mailed to me 5/24/11 in late afternoon to forward to Steve Call, Structural Plan Review for PDS for this project. Two PDF's of S4.1 & S5.1 were provided. There were no calculations or additional plans. Sarah indicated the design details were per previous dicussions with Steve and new calcs were not needed. I forwarded sheets to Steve Call and ask him to call me.
Telephone call  5/25/2011 DONE
Steve Call returned my call. Said he had not talked with Sarah yesterday. He had received the PDF Sheets S4.1 & S5.1. He said they were not sufficient for him to review and approve for final structural review. Needed Sheets S4.0, S4.1, S5.1, S6.0, S8.0 & S8.1 with new associated engineering design calcs for the lateral load transfer proposed by new straps, beams and connections. Steve offered to call Sarah to discuss but I had just tried to call Sarah and she was out of the office to a meeting and would call me when she returned. I told Steve i would pass on the information of data needed to Sarah.
Telephone call  5/25/2011 DONE
Talked with Brian in McClendon Engineering office. Sarah was at the meeting. I left my phone number and the plan sheet page numbers needing to be submitted, S4.0, 4.1, 5.1, 6.0, 8.0, & 8.1 and supporting structural design calculations for lateral load connection straps, steel beams and connections.
Meeting  5/25/2011 DONE
Talked with Jenifer Gilliand, Jason Blais & Ron Hill concerning the plan sheets provided by Sarah McClendon, forwarding them to Steve Call, phone conversation with Steve Call concerning PDF provided and information and plans yet needing to be submitted before Steve could review for approval for structural plan review. Waiting to hear back from Sarah McClendon.
Telephone call  5/24/2011 DONE
Talked with Justin Wall concerning were to specifically find the 'as specified' insulation data proposed for use in each area & assembly of this project. Justin will verify specific insulation type and provide me a list of the location, plan detail and type of insulation proposed. Reviewed use of fire assembly detail GA File No. WP 3242, 18th edition of gypsum fire amnual, in place of Detail 4/A5.1as this assembly would match his proposed framing layout. Attached copy of assembly to plans over Detail 4/A5.1.
Plan Reviewer's activity  5/24/2011 DONE
Forwarded a copy of the 3rd Structural Engineering Plan Review Report to Jim Glancey & Justin Wall of Glancey Rockwell. E-mailed a copy of the report to Ron Hill, Project manager.
Routing Off Site - STRUCTURAL5/13/2011 5/23/2011 FAIL
DetailsDan Stuart
Structural Engineering Plan Review Report received. Review failed. Structural plan review engineer met with design team engineer for a few hours to review the comments and possible methods to resolve. A copy of the report was given to Sarah McClendon at the meeting. I will forward copy to Design Professional of Record tomorrow AM.
Telephone call  5/23/2011 DONE
Talked with Contract Structural Plan Reviewer, Steve Call. He thought the review would be done today but that resubmittals are required. He will contact Sarah McClendon as soon as report is done to review with her (design engineer).
Telephone call  5/23/2011 DONE
Steve Call said he had spent the last two hours with Sarah McClendon going over items remaining to be addressed in structural plan review. Had resolved most of the issues. Sarah will prepare required documents and details. Steve gave Sarah a copy of the report and is e-mailing me a copy now.
Plan resubmittals received  5/19/2011  
DetailsBarbara Stitt
Received 1 cover tranmittal, 3 copies of sheet E-1.0, 3 copies of sheet E-3.3 and then given to Ron Hill
Routing PW Street Lights5/19/2011 5/19/2011 PASS
DetailsMike D Hedge
Routing PW Street Lights5/13/2011 5/16/2011 FAIL
DetailsMike D Hedge
Reasions for original failure were not addressed in the resubmittal. Failed by Mike, please contact me at ###-####.
Plan resubmittals received  5/13/2011 DONE
DetailsChristina Prado
Received three sets of structural calcs as well as three sets of plans S1.0, S2.0, S2.1, S3.0, S3.1, S4.0, S4.1, S5.0, S5.1, S6.0, S7.0, S8.0 & S8.1. Inserted by Ron Hill
Telephone call  5/13/2011 DONE
DetailsChristina Prado
Called Action Couriers for Monday mording pick up at 4:45 pm
Routing PW Sewer Design5/13/2011 5/13/2011 PASS
DetailsJon R. Gunnerson
Sewer Tap Permit Required
Plan resubmittals received  5/12/2011 DONE
DetailsTisha Gallop
received response, two copies of ES report, Addendum one, two & three, plan sheets A-CVR, C2.01, C4.01, C5.00, A-0.1, A-0.2, A-1.1, A-1.2, A-1.3, A-1.4, A-1.5, A-1.6, A-1.7, A-1.8, A-2.1, A-2.2, A-3.1, A-3.2, A-3.3, A-3.4, A-3.5, A-4.1, A-4.2, A-5.1, A-6.1, A-6.2, A-6.3, M-1.0, M-1.1, M-1.2, M-1.3, M-1.4, M-3.2, M-4.1, E-2.0F, E-2.1F, E-2.2F, E-3.2, E-3.3; inserted by Ron Hill and taken back to Dan Stuart.
Routing Off Site - STRUCTURAL4/19/2011 4/30/2011 FAIL
DetailsDan Stuart
called Action Couriers for pick up
4/30/11 - Copy of 2nd Structural Review Report e-mailed to Design Professional of Record, Jim Glancy.
Plan Reviewer's activity  4/18/2011 DONE
Copy of structural resubmittal plans and calcs received 4/15/11, taken to permit counter to be routed to outsource structural engineering firm for second review.. Plans left on drafting table behind permit counter stations.
Plan resubmittals received  4/15/2011 DONE
Received 3 supplemental structural calcs,& 3 copies of sheets S1.0,S2.0,S2.1,S3.0,S3.1,S4.0,S4.1,S5.0,S5.1,S6.0,S7.0,S8.0,S8.1 inserted by Sara Mcclendon and taken back to Dan.
Telephone call  3/23/2011 DONE
Call from Justin inquiring about plan review comment concerning the identification signage for fire barrier walls per section 703.6. Marking on both sides of fire barrier walls between the parking garage and the residential & assembly area and on wall between the assembly area and the residential area. Exception for walls between R-2 Occupancies would apply.
Routing - FIRE3/8/20113/8/20113/11/2011 PASS
DetailsScott Arellano
Attached IFC comments to plans
1st review completed  3/11/2011 FAIL
Failed Public Works, Erosion & Soil Control, Structural, Plan Check
Route to Impact Fee Review3/8/20113/11/20113/9/2011 PASS
DetailsCindy M. Gould
Meeting  3/8/2011 DONE
Ron Hill, Project Manager, stopped by to check on project status. I reviewed my meeting with Jim Glancey & Justin Wall yesterday afternoon to review code concerns. Plan review report will go out today.
Routing - PLAN CHECK2/25/2011 3/8/2011 FAIL
DetailsDan Stuart
Dan Stuart.
Telephone call  3/8/2011 DONE
Justin called and we aset a time of 4 pm today to meet and discuss plans.
Plan Reviewer's activity  3/7/2011 DONE
4 pm - met with Jim Glancey & Justin Wall to review concerns with Plans for 12th & river Senior Apartments, Enclosed Parking Garage and support areas. Discussion involved opening in corridor floor between 2 & 3rd floors, piping duct & vent penetrations between floor and if there are rated shafts of if using fire dampers & firestopping at each penetration at each floor, Stair enclosure wall construction, exiting and opening protection, there occupancy classification of the main floor common area, elevator door smoke protection at opening to corridor (question on this one and they wanted an interpretation from Jason Blais, B.O.), energy code watts per square foot used for parking garage and other parts of common areas, Daylighting and lighting controls in those areas at 1st, 2nd and 3rd floors, Allowe glazing in doors for safety glass - wire glass does not copmly W/O testing for safety glass, special inspection for high strength bolts per sec. 1704, proposed fire-rated wall and floor assemblies for component make-up and additional requirements before insulation can be added if not part of the tested assembly originally, louvers not allowed in smoke doors connected to the rated corridor, the specific areas that would require a full 1-hr horizontal assembly (cannot be reduced by sprinklers and support structure needs to be rated to match assembly, need for supporting data for use of foam plastic insulation per Ch. 26 IBC. I told them I would call them back tommorrow with interpretation on need for smoke protection at elevators and finish plan review write up based on our discussion for their response.
Meeting  3/7/2011 DONE
Meeting with Jim Glancey & Justin Walls to review plans submitted for 12th & River Senior Apartments at 4 pm today.
Telephone call  3/3/2011 DONE
Called to set up meeting with design architects Jim Glancey, to sit down with me to review questions concerning the 12th & River Senior Apartment. I ended up talking with Justin Wall concerning the openings in the floor of the corridor, how ar floor penetrations being handle (shafts or firestopping at each floor & fire dampers) and other items. I aks if he could talk with Jim Glancey and then call me to set up a meeting so we could review all the items of concern. Justin will check and call me back.
Routing - Erosion and Sediment2/25/2011 2/25/2011 PASS
DetailsClint A Smith
ESC11-00054 approved per the attached conditions with the alteration within the plan pertaining to the process of dewatering.
Routing Off Site - STRUCTURAL1/31/2011 2/23/2011 FAIL
DetailsDan Stuart
Copy of Structural Plan Review Resubmittal requirements e-mailed to architect.
Routing - PLUMBING2/9/2011 2/14/2011 PASS
DetailsBill VanDegrift
per plans and 2003 upc
Routing - PLANNING2/14/2011 2/14/2011 PASS
DetailsJosh Wilson
DRH10-00302 Josh Wilson, CUP10-00079 Susan Riggs
Routing - PUBLIC WORKS2/1/2011 2/9/2011 FAIL
DetailsConnie Baumgartner
Plan failed by Jon Gunnerson, contact at ###-#### and Hank Alarcon at ###-####
Routing - Erosion and Sediment2/9/2011 2/9/2011 FAIL
DetailsSteven Webb
ESC information is needed, refer to ESC case activity. ESC11-00054
Routing PW Sewer Design2/2/2011 2/9/2011 FAIL
DetailsJon R. Gunnerson
Sanitary sewer to tap into existing manhole 69A1. Engineer will resubmit plans.
Routing PW Solid Waste  2/8/2011 PASS
DetailsPeter J. McCullough
Routing PW Drainage2/4/2011 2/8/2011 PASS
DetailsBrian Murphy
Routing PW Street Lights2/4/2011 2/4/2011 FAIL
DetailsHank Alarcon
Called e2co electrical engineering Company on 02/04/2011 and advised them that design detail for Historical light is not shown, size of conduit is not correct, type light fixture (LED) needs to be noted and connection point shown on drawing is incorrect per note 9, circuit will need to connected to Historical light 13C09
Routing PW Sewer Rating2/1/2011 2/2/2011 PASS
DetailsConnie Baumgartner
Routing - Addressing2/1/2011 2/1/2011 PASS
DetailsTerry Records
Routing - PLANNING Land Div1/31/2011 2/1/2011 PASS
DetailsTodd Tucker
Application received 1/31/20111/31/2011 DONE
DetailsTisha Gallop
Plans ACCEPTED BY PLAN TECH  1/31/2011 DONE
DetailsTisha Gallop
Recd Pcfee & Taken To Pln CK  1/31/2011 DONE
DetailsTisha Gallop
Pending Assignment by JCM1/31/2011 1/31/2011 DONE
DetailsJohn Menard
Pending Assignment by JCM1/31/2011 1/31/2011 DONE
DetailsJohn Menard
Telephone call  1/31/2011 DONE
DetailsTisha Gallop
called Action Couriers for pick up
Intake Approval  1/27/2011 PASS
Routing - PLAN CHECK2/14/2011    
DetailsDan Stuart
Dan Stuart