Third Notice | | 1/16/2017 | 2/13/2017 | | DONE |
Christina Prado
|
|
|
emailed to Jordan Wilcomb rep.
|
Third Notice | | 12/18/2016 | 1/11/2017 | | DONE |
|
|
|
|
Third Notice | | 11/26/2016 | 12/13/2016 | | DONE |
|
|
|
|
Third Notice | | 10/15/2016 | 11/21/2016 | | DONE |
|
|
|
|
Third Notice | | 9/24/2016 | 10/10/2016 | | DONE |
|
|
|
|
Third Notice | | 8/17/2016 | 9/19/2016 | | DONE |
|
|
|
|
Third Notice | | 7/16/2016 | 8/12/2016 | | DONE |
|
|
|
|
Second Notice | | 6/20/2016 | 7/11/2016 | | DONE |
|
|
|
Mailed 7-12-16
|
First Notice | | 5/30/2016 | 6/10/2016 | | DONE |
|
|
|
Mailed 6-13-16
|
BLD-Final | 5/19/2016 | 5/20/2016 | 5/20/2016 | A | PASS |
Jim Sly
|
|
|
Kevin Phone #: ###-#### OK for Perm Occ.
|
Permanent Occupancy | | | 5/20/2016 | | DONE |
Christina Prado
|
|
|
|
Zoning Approval | 5/19/2016 | 5/19/2016 | 5/19/2016 | | PASS |
Josh Wilson
|
|
|
Final ok
|
BLD-Final | 5/9/2016 | 5/10/2016 | 5/10/2016 | A | PART |
Dave Hannah
|
|
|
Kevin Phone #: ###-#### ok to occ the office area
|
BLD-Other | 4/28/2016 | 4/28/2016 | 4/29/2016 | P | DONE |
Dave Hannah
|
|
|
Hand rail // Kevin Phone #: ###-####
|
BLD-Conference | 4/29/2016 | 4/29/2016 | 4/29/2016 | A | PART |
Dave Hannah
|
|
|
Hand rail // Kevin Phone #: ###-#### ok to use mezzanine
|
Temporary Occupancy | 4/26/2016 | 7/25/2016 | 4/26/2016 | | DONE |
Carlos Velazquez
|
|
|
see Jason Blais approval attached
|
BLD-Final | 4/21/2016 | 4/22/2016 | 4/25/2016 | P | PART |
Dave Hannah
|
|
|
Kevin Phone #: ###-#### need PW inspection ok for temp occ tasting rm
|
PubWorks Occupancy Approval | 4/25/2016 | 4/25/2016 | 4/25/2016 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 4/21/2016 | 4/22/2016 | 4/22/2016 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with curent inspection tags. Signage for fire sprinkler riser room to be installed before final building inspection. Final life fire safety inspection passed/complete.
|
Zoning Approval Temp | 4/21/2016 | 4/21/2016 | 4/21/2016 | | PASS |
Josh Wilson
|
|
|
180 day ok
|
BLD-Conference | 4/19/2016 | 4/20/2016 | 4/20/2016 | A | DONE |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|
CHANGE STATUS TO (ISS) | | | 4/13/2016 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 3/24/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 3/4/2016 | 3/4/2016 | 3/24/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan mod Payetter Brewery
|
Routing - PLAN CHECK | 3/8/2016 | | 3/24/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
walk in coolers
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2016 | | DONE |
Christina Prado
|
|
|
DO NOT RE-ISSUE - PLAN MOD APPROVED FOR DEFERRED SUBMITTAL
Must pay all fees prior to changing status to ISS
|
Routing - PLUMBING | 3/8/2016 | | 3/11/2016 | | PASS |
Daryl Spivey
|
|
|
additional cross connection protection may be required
|
Routing - FIRE | 3/8/2016 | 3/8/2016 | 3/9/2016 | | PASS |
Katie Marron
|
|
|
Cooler plans reviewed. Modifications to the fire sprinkler plans/permit will be required.
|
Routing - MECHANICAL | 3/8/2016 | | 3/8/2016 | | PASS |
Troy James
|
|
|
no review required
|
Plan Modification Accepted | | | 3/4/2016 | | DONE |
Christina Prado
|
|
|
Deferred submittal requested for built in cooler revisions
|
BLD-Framing/Rough-in | 2/29/2016 | 3/1/2016 | 3/1/2016 | A | PASS |
Dave Hannah
|
|
|
Kevin Phone #: ###-####ext soffits
|
BLD-Framing/Rough-in | 2/18/2016 | 2/19/2016 | 2/19/2016 | A | PASS |
Dave Hannah
|
|
|
Kevin-tasting room Phone #: ###-####
|
Print Occupancy Form | | | 2/5/2016 | | DONE |
Christina Prado
|
|
|
|
BLD-Framing/Rough-in | 1/28/2016 | 1/29/2016 | 1/29/2016 | A | PART |
Mike Jordan
|
|
|
Ceiling // Kevin Phone #: ###-####. Provide detail for hardlids.
|
CHANGE STATUS TO (ISS) | | | 1/22/2016 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 1/21/2016 | | |
|
|
|
|
Plan assigned to (AJS) | 1/21/2016 | 1/21/2016 | 1/21/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Plan Mod. Payette Brewery
|
Telephone call | | | 1/21/2016 | | DONE |
|
|
|
Mike called and said that he will let Brad know that the plan mod needs to be done online and that paper plans need to be picked up
|
Routing - PLAN CHECK | 1/21/2016 | | 1/21/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
plan mod to remove drinking fountain from tasting room only
|
Routing - PUBLIC WORKS | 1/21/2016 | | 1/21/2016 | | PASS |
Rachael Beierle
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/21/2016 | | DONE |
Christina Prado
|
|
|
**DO NOT RE-ISSUE** Plan mod only
All requirements met for plan mod, must pay additional review fees prior to changing status to ISS
|
Plan Modification Accepted | | | 1/21/2016 | | DONE |
Christina Prado
|
|
|
Plan mod requested by architecture firm to remove existing drinking fountain
|
CHANGE STATUS TO (ISS) | | | 1/20/2016 | | DONE |
|
|
|
Plan Mod Should be done online
|
Telephone call | | | 1/20/2016 | | DONE |
|
|
|
Left a message for Mike F that the Plan modification would need to be done online since the original plans were don't online.
|
BLD-Framing/Rough-in | 1/14/2016 | 1/14/2016 | 1/15/2016 | P | PASS |
Dave Hannah
|
|
|
Kevin Phone #: ###-####
|
Issue PAID IN FULL permit | | | 12/28/2015 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/28/2015 | | DONE |
|
|
|
|
Expiration Notice | 12/18/2015 | 1/12/2016 | 12/18/2015 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 12/2/2015 | | |
|
|
|
|
Plan assigned to (AJS) | 7/21/2015 | 7/21/2015 | 12/2/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
1st review completed 8/17Level 3 TI - ePlanReview - Payette Brewery
|
Routing - PLAN CHECK | 12/2/2015 | | 12/2/2015 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/2/2015 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/2/2015 | | DONE |
|
|
|
**MET** NEED GC Form and Certificate of value
|
Routing - PLUMBING | 11/20/2015 | | 11/27/2015 | | PASS |
Bill VanDegrift
|
|
|
|
Routing PW Sewer Design | 11/20/2015 | | 11/27/2015 | | PASS |
Mike Sheppard
|
|
|
signed off in e plan and grd15-00044
|
Routing - PLAN CHECK | 11/20/2015 | | 11/27/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - Design Review | 11/20/2015 | | 11/25/2015 | | PASS |
Josh Wilson
|
|
|
Ok per DRH15-00435
|
Routing PW Flood Plain | 7/22/2015 | | 11/25/2015 | | PASS |
Jim Wyllie
|
|
|
Applicant needs to submit an Elevation Certificate for the Building Permit.
Jim Wyllie / ###-####
|
Routing PW Flood Plain | 11/20/2015 | | 11/25/2015 | | PASS |
Jim Wyllie
|
|
|
|
Routing PW Drainage | 11/20/2015 | | 11/24/2015 | | PASS |
Jason C. Taylor
|
|
|
See GRD15-00044 for original approval- This approval was for modification. JCT
|
Routing PW Sewer Rating | 11/20/2015 | | 11/20/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - MECHANICAL | 11/20/2015 | | 11/20/2015 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 11/20/2015 | | 11/20/2015 | | PASS |
Cody Riddle
|
|
|
|
Plan Reviewer's activity | | | 11/18/2015 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
deleted all uploaded sheets all sheets must be named to version
|
Route to Impact Fee Review | 8/17/2015 | 8/20/2015 | 8/19/2015 | | PASS |
Cindy M. Gould
|
|
|
Building will remain commercial CMG
|
1st review completed | | | 8/17/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing - PLAN CHECK | 7/21/2015 | | 8/17/2015 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
|
Routing PW Drainage | 7/22/2015 | | 8/17/2015 | | FAIL |
Brian Murphy
|
|
|
See Grading permit for details. Jason Taylor
|
Routing PW Solid Waste | 7/22/2015 | | 8/14/2015 | | PASS |
Megan Durrell
|
|
|
Architect agreed to remove bollards in/around trash enclosure. Gates to open 120 degrees.
|
Routing PW Environmental | 7/22/2015 | | 8/14/2015 | | PASS |
Rick Christenson
|
|
|
Architect notified future Pretreatment may be needed for compliance.
|
Routing PW Sewer Design | 7/22/2015 | | 8/6/2015 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Provide Utility Sheet or otherwise show connection points to public sewer. New sewer connections require 48 hour notice to public works to schedule inspection and tap permit.
Grading Sheet: maximum height of grade rings is 21".
|
Routing PW Sewer Rating | 7/22/2015 | | 7/30/2015 | | FAIL |
Beverly Mountain
|
|
|
Information required from owner regarding flows prior to sign off. May require sampling station. bam
|
Routing - PLUMBING | 7/21/2015 | | 7/28/2015 | | FAIL |
Bill VanDegrift
|
|
|
Install RPBP on filtered water and on boiler line. Also 4 inch drain required in room with 3 inch RPBP.
|
Routing - MECHANICAL | 7/21/2015 | | 7/24/2015 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 7/21/2015 | 7/21/2015 | 7/23/2015 | | PASS |
Scott Arellano
|
|
|
Comments attached to case.
|
Routing PW Street Lights | 7/22/2015 | | 7/23/2015 | | PASS |
Mike D Hedge
|
|
|
|
Routing - PLANNING | 7/21/2015 | | 7/22/2015 | | FAIL |
Cody Riddle
|
|
|
Cody Riddle - CUP15-00010
Site specific condition of approval #6 required a floodplain development permit prior to issuance of construction permits. Emailed the architect/applicant this morning. CER
|
Routing - Design Review | 7/21/2015 | | 7/22/2015 | | PASS |
Josh Wilson
|
|
|
Josh Wilson - DRH15-00209
|
Routing - PUBLIC WORKS | 7/21/2015 | | 7/22/2015 | | PASS |
Beverly Mountain
|
|
|
|
Routing - Addressing | 7/21/2015 | | 7/21/2015 | | PASS |
Emily Dixon
|
|
|
|
Intake Approval | | | 7/21/2015 | | PASS |
Jason Blais
|
|
|
Prescreen approved by Javier Guzman and plan review fees paid.
|
Pending Assignment by JCB | 7/21/2015 | | 7/21/2015 | | DONE |
Jason Blais
|
|
|
|
Routing - Erosion and Sediment | 7/21/2015 | | 7/21/2015 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required prior to Earth Disturbance)
NOTE: THIS PLAN MEETS THE CITY OF BOISE BCC 8-17 ESC REQUIREMENTS, BUT NOT THE FEDERAL EPA SWPPP REQUIREMENTS. DUE TO BEING OVER AN ACRE, AN eNOI NEEDS TO BE FILED WITH THE EPA, AND MEET SWPPP REQUIREMENTS. The City cannot Fail due to this fact, since it meets the City's ESC Requirements.
Evan Jenkins ###-####
PAYETTE BREWERY) Change of use from an existing health club with office to a production brewery - office and tasting room. Work will include: loading docks, new rollup doors, metal awnings, a parapet over the east side. Demo work will include cutting existing tilt-up concrete walls.
|
Intake Approval | | | 7/20/2015 | | FAIL |
Javier Guzman
|
|
|
Please provide the following:
1. Electrical Building Plans drawn to scale on 18”x24” minimum size plan sheets
2. Erosion & Sediment Control (ESC) Plan Waiver Request Letter in lieu of an Erosion & Sediment Control plan if applicable. See form #707 – ESC Requirements for Tenant Improvements or Erosion & Sediment Control (ESC) ESC plans (2 paper copies incorporated into plans), and ESC narrative if applicable. Plans must be designed for the specific project, and be prepared and signed by a plan designer certified by Boise City. See form #707 – ESC Requirements for Tenant Improvements.
3. The submitted Drainage System Operation & Maintenance Plan is blank from page 1 to page 9, please resubmit.
4. Missing plan sheet S6.01 as shown on checklist and foundation plan sheet.
|
Application received | | | 7/16/2015 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 16 2015 9:03AM
|