First Notice | | 1/16/2020 | 3/3/2020 | | DONE |
|
|
|
|
Meeting | | | 1/16/2020 | | DONE |
|
|
|
Per contact with Renee New with Boise Airport, all value should have been claimed on BLD17-00386. Minimal work was done under BLD17-01549 to establish square footage for tenant space addition and remodel. Majority of value (minus minimum value) was moved to BLD17-00386 per final value submitted. Credit for fees erraneously paid on BLD17-01549 are credited to BLD17-00386.
|
Permanent Occupancy | | | 1/6/2020 | | DONE |
|
|
|
|
BLD-Final | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | PASS |
Jim Storey
|
|
|
Inspection requested via web by Ron Goff
|
FIRE-Final Inspection | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
FIRE-Alarm Testing | 12/5/2019 | 12/5/2019 | 12/5/2019 | P | CANC |
Troy Cobbley
|
|
|
wrong inspection type scheduled.
life safety reinspection Phone #: ###-#### Inspection requested via web by Ron Goff
|
Change Expiration Date Only | | | 10/15/2019 | | DONE |
Jason Blais
|
|
|
A 180 day extension approved. First extension for an issued permit.
|
CHANGE STATUS TO (ISS) | | | 6/6/2019 | | DONE |
|
|
|
Plan mod submittedon 4/30 was cancelled
|
Routing - FIRE | 5/20/2019 | 5/20/2019 | 6/4/2019 | | CANC |
Erika Akin
|
|
|
Plan mod will be removed and resubmitted as a seperate TI
|
Routing - MECHANICAL | 5/20/2019 | | 5/21/2019 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 4/30/2019 | | DONE |
|
|
|
Revision to tenant space that will be occupied by Fedex. These revisions include the addition of Fedex Office 138A, Fedex Break 138B, shower 138C, and restroom 138D. Modification in the Existing Bay 139 include the replacement of existing sloped concrete for an accessible egress path for the tenant.
|
BLD-Final | 2/14/2019 | 2/15/2019 | 2/15/2019 | P | PART |
Brandon Shaw
|
|
|
Temp. Occupancy for Phase 3 is approved...
|
FIRE-Final Inspection | 2/15/2019 | 2/15/2019 | 2/15/2019 | P | PART |
Jim Page
|
|
|
Life fire safety inspection for Phase 3 complete. Will need to have access control comply with chapter 10 of IFC before final inspection of project.
Please call when at the gate Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
|
FIRE-Final Inspection | 2/14/2019 | 2/15/2019 | 2/15/2019 | A | CANC |
Jim Page
|
|
|
Please call when at the gate. Phone #: ###-#### >> Inspection requested via web by Harvey VanderVeen Inspection cancelled from web by: Harvey VanderVeen
|
FIRE-Final Inspection | 10/26/2018 | 10/26/2018 | 10/26/2018 | P | PART |
Troy Cobbley
|
|
|
Life safety for phase 2 passed
|
BLD-Final | 10/24/2018 | 10/25/2018 | 10/25/2018 | P | PASS |
Jim Storey
|
|
|
Temp. Occupancy for Phase 2 Phone #: ###-#### Inspection requested via web by Harvey VanderVeen first phase ok
|
FIRE-Final Inspection | 10/24/2018 | 10/25/2018 | 10/25/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need small documents, need exit discharge lighting corrected as discussed, need fire alrm permit and fire sprinkler work completed.
Temp. Occupancy for Phase 2 Phone #: ###-#### Inspection requested via web by Harvey VanderVeen
|
FIRE-Alarm Testing | 10/24/2018 | 10/25/2018 | 10/24/2018 | A | CANC |
Troy Cobbley
|
|
|
Temp. Occupancy for Phase 2 Phone #: ###-#### >> Inspection requested via web by Harvey VanderVeen Inspection cancelled from web by: Harvey VanderVeen
|
FIRE-Final Inspection | 10/24/2018 | 10/25/2018 | 10/24/2018 | A | CANC |
Troy Cobbley
|
|
|
Temp. Occupancy for Phase 2 Phone #: ###-#### >> Inspection requested via web by Harvey VanderVeen Inspection cancelled from web by: Harvey VanderVeen
|
BLD-Final | 10/24/2018 | 10/25/2018 | 10/24/2018 | A | CANC |
Jim Storey
|
|
|
Temp. Occupancy for Phase 2 Phone #: ###-#### >> Inspection requested via web by Harvey VanderVeen Inspection cancelled from web by: Harvey VanderVeen
|
FIRE-Final Inspection | 10/23/2018 | 10/24/2018 | 10/24/2018 | P | CANC |
Troy Cobbley
|
|
|
Temp. Occupancy for Phase 2 Phone #: ###-#### >> Inspection requested via web by Harvey VanderVeen Inspection cancelled from web by: Harvey VanderVeen
|
FIRE-Alarm Testing | 10/23/2018 | 10/24/2018 | 10/24/2018 | P | CANC |
Troy Cobbley
|
|
|
Temp. Occupancy for Phase 2 Phone #: ###-#### >> Inspection requested via web by Harvey VanderVeen Inspection cancelled from web by: Harvey VanderVeen
|
BLD-Final | 10/23/2018 | 10/24/2018 | 10/24/2018 | P | CANC |
Jim Storey
|
|
|
Temp. Occupancy for Phase 2 Phone #: ###-#### >> Inspection requested via web by Harvey VanderVeen Inspection cancelled from web by: Harvey VanderVeen
|
Plan Reviewer's activity | | | 10/24/2018 | | DONE |
Jason Blais
|
|
|
Received Preliminary Commissioning Report for first phase. Uploaded into ePlanReview case.
|
BLD-Final | 10/19/2018 | 10/23/2018 | 10/19/2018 | A | CANC |
Jim Storey
|
|
|
Temp. Occupancy for Phase 2 Phone #: ###-#### >> Inspection requested via web by Harvey VanderVeen Inspection cancelled from web by: Harvey VanderVeen
|
FIRE-Final Inspection | 10/19/2018 | 10/22/2018 | 10/19/2018 | A | CANC |
Troy Cobbley
|
|
|
Phone #: ###-#### >> Inspection requested via web by Harvey VanderVeen Inspection cancelled from web by: Harvey VanderVeen
|
BLD-Final | 10/18/2018 | 10/19/2018 | 10/19/2018 | P | NR |
Jim Sly
|
|
|
Temporary Occupancy for Phase 2. Early afternoon if possible Thanks Phone #: ###-#### Inspection requested via web by Harvey VanderVeen Need Fire Final 1st.
|
CHANGE STATUS TO (ISS) | | | 8/23/2018 | | DONE |
|
|
|
Plan Mod
|
Print Statement | | | 8/22/2018 | | DONE |
|
|
|
|
Expiration Notice | 8/17/2018 | 9/10/2018 | 8/17/2018 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 6/18/2018 | | |
|
|
|
|
OVERRIDE | | | 6/18/2018 | | |
|
|
|
|
Plan assigned to (CDM) | 4/17/2018 | 4/17/2018 | 6/18/2018 | | PASS |
Carl D Madsen
|
|
|
Plan Mod
|
Routing - PLAN CHECK | 6/4/2018 | | 6/18/2018 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/18/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 6/18/2018 | | DONE |
|
|
|
PLAN MOD
|
Routing - PLAN CHECK | 4/23/2018 | | 5/29/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 4/23/2018 | | 5/23/2018 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLANNING | 4/23/2018 | | 5/23/2018 | | PASS |
Todd Tucker
|
|
|
|
Routing - FIRE | 4/23/2018 | 4/23/2018 | 5/2/2018 | | PASS |
Erika Akin
|
|
|
Attached comments to case
|
Routing - PLUMBING | 4/23/2018 | | 4/24/2018 | | PASS |
Bill VanDegrift
|
|
|
s.s. vents cannot connect to the flammible vapor venting system.
|
Routing - PUBLIC WORKS | 4/23/2018 | | 4/23/2018 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 4/23/2018 | | 4/23/2018 | | PASS |
Troy James
|
|
|
|
Plan Modification Accepted | | | 4/17/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod - interior reconfiguration
|
Issue PAID IN FULL permit | | | 9/13/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/13/2017 | | DONE |
|
|
|
|
Extend Review Timeline | | | 8/11/2017 | | DONE |
|
|
|
1st Approved 180 day Extension per Adele. See documents
|
Expiration Notice | 7/27/2017 | 8/17/2017 | 7/27/2017 | | DONE |
Brittany Hill
|
|
|
|
OVERRIDE | | | 5/19/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 5/19/2017 | | DONE |
Christina Prado
|
|
|
Need RP, - need
GC Form & met 8-31-17
Revised Certificate of Value for issuance met 8-31-17
DO NOT ISSUE WITHOUT BLD17-01549
|
Plan assigned to (CDM) | 3/1/2017 | 3/1/2017 | 5/18/2017 | | PASS |
Carl D Madsen
|
|
|
1st comp. BOI Airport Fire Station remodel/addition
|
Routing - PLAN CHECK | 5/16/2017 | | 5/18/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 5/16/2017 | | 5/18/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/27/2017 | | 5/8/2017 | | FAIL |
Carl D Madsen
|
|
|
Failed pending structural
|
Routing Off Site - STRUCTURAL | 4/27/2017 | | 5/8/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 4/3/2017 | | 4/20/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 4/3/2017 | | 4/20/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - FIRE | 4/3/2017 | 4/3/2017 | 4/3/2017 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Route to Impact Fee Review | 3/16/2017 | 3/19/2017 | 3/17/2017 | | PASS |
Tonya Wallace
|
|
|
Review requested for Commercial Permit
|
Routing Off Site - STRUCTURAL | 3/16/2017 | | 3/16/2017 | | FAIL |
Carl D Madsen
|
|
|
|
1st review completed | | | 3/16/2017 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 3/1/2017 | | 3/16/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 3/1/2017 | | 3/8/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Sewer Design | 3/1/2017 | | 3/6/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - FIRE | 3/1/2017 | 3/1/2017 | 3/3/2017 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - Erosion and Sediment | 3/1/2017 | | 3/3/2017 | | PASS |
Melissa Jannusch
|
|
|
RP TBD. DI protection (11), contractor staging area, concrete washout.
|
Routing - PLANNING Land Div | 3/1/2017 | | 3/2/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 3/1/2017 | | 3/1/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 3/1/2017 | | 3/1/2017 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLUMBING | 3/1/2017 | | 3/1/2017 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 3/1/2017 | | 3/1/2017 | | PASS |
Andrea Tuning
|
|
|
|
Intake Approval | | | 3/1/2017 | | PASS |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 3/1/2017 | | DONE |
|
|
|
|
Application received | | | 2/24/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Feb 24 2017 11:00AM
|
Plan assigned to (CDM) | 4/30/2019 | 4/30/2019 | | | |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 5/20/2019 | | | | |
Carl D Madsen
|
|
|
|