BLD-Final | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
DOC - Permit Finaled | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Wall Bracing | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PASS |
Brandon Shaw
|
|
|
Dave Phone #: ###-####
|
BLD-Conference | 6/12/2017 | 6/12/2017 | 6/12/2017 | P | DONE |
Jim Sly
|
|
|
Anytime after 1:00 Pm. Thank you! Phone #: ###-#### Inspection requested via web by Matt Kiser Foundation PASS
|
BLD-Footing | 6/5/2017 | 6/6/2017 | 6/7/2017 | P | PASS |
Jim Sly
|
|
|
Matt Phone #: ###-####
|
OVERRIDE | | | 5/17/2017 | | |
|
|
|
|
Plan assigned to (JAB) Josh | 5/17/2017 | 5/17/2017 | 5/17/2017 | | PASS |
Brian McGowan
|
|
|
|
Plan assigned to (BJM) | 5/17/2017 | 5/17/2017 | 5/17/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (BLD) | 5/15/2017 | 5/15/2017 | 5/17/2017 | A | DONE |
Brian McGowan
|
|
|
Took plans in. Brian has them.
|
Routing - PLAN CHECK | 5/17/2017 | | 5/17/2017 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/17/2017 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 5/17/2017 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/17/2017 | | DONE |
|
|
|
|
Telephone call | | | 5/17/2017 | | DONE |
|
|
|
called Matt to know permit is ready
|
Issue PAID IN FULL permit | | | 5/17/2017 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 5/8/2017 | 5/8/2017 | 5/8/2017 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 5/8/2017 | 5/8/2017 | 5/8/2017 | P | FAIL |
|
|
|
|
Routing Walk-In (Zoning) | 4/14/2017 | 4/14/2017 | 4/14/2017 | P | FAIL |
Katelyn Menuge
|
|
|
Need Site Plan
|
Routing Walk-In (BLD) | 4/14/2017 | 4/14/2017 | 4/14/2017 | P | FAIL |
Brian McGowan
|
|
|
Proposing to build a 720 square foot shop with 12' walls. Needs engineering and more accurate plans.
|
1st review completed | | | 4/14/2017 | | FAIL |
Brian McGowan
|
|
|
Proposing to build a 720 square foot shop with 12' walls. Needs engineering and more accurate plans.
|
Routing - PLAN CHECK | 4/14/2017 | | 4/14/2017 | | FAIL |
Brian McGowan
|
|
|
Proposing to build a 720 square foot shop with 12' walls. Needs engineering and more accurate plans.
|
Application received | | 4/14/2017 | | | |
|
|
|
|