Information based on query as of Monday, May 20, 2024.
Permit Information
Permit NumberBLD17-01638
StatusFinaled
Name ROBINSON BRENDA K
Site Address 10202 W HARVESTER DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for a 28'x40' (1120 square feet) detached Garage with 12' exterior walls. Storage is proposed over the garage. All work to be done according to plans, notes, engineering and local codes. Separate electrical and erosion permits are required. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/16/201710/16/201710/16/2017PPASS
DetailsMike Jordan
plesae call when on way // Rob Robinson Phone #: ###-####
DOC - Permit Finaled10/16/201710/16/201710/16/2017PPASS
DetailsMike Jordan
BLD-Framing/Rough-in8/14/20178/14/20178/14/2017PPASS
DetailsMike Jordan
Please call for access and with questions - Ron Phone #: ###-####
BLD-Wall Bracing7/11/20177/12/20177/12/2017APASS
DetailsMike Jordan
Ben Phone #: ###-####. North and south walls ok.
BLD-Wall Bracing7/10/20177/11/20177/11/2017APASS
DetailsMike Jordan
Ben Phone #: ###-####. East and west walls ok. Will call in tomorrow for north and south walls.
BLD-Foundation6/9/20176/12/20176/12/2017APASS
DetailsJim Sly
Rob Phone #: ###-####
BLD-Footing6/8/20176/9/20176/9/2017PPASS
DetailsDave Hannah
John Phone #: ###-####
BLD-Footing6/5/20176/5/20176/5/2017PPART
DetailsMike Jordan
Call hour before // Rob Phone #: ###-####. footings excavated. Needs to build forms and place reinforcement. set backs ok.
OVERRIDE  5/26/2017  
Routing Walk-In (Zoning)5/26/20175/26/20175/26/2017APASS
DetailsDavid Moser
Approved as redlined with 30 foot rear setback
Routing Walk-In (BLD)5/26/20175/26/20175/26/2017ADONE
DetailsBrian McGowan
1st review completed  5/26/2017 DONE
DetailsBrian McGowan
Routing - PLAN CHECK5/26/2017 5/26/2017 PASS
DetailsBrian McGowan
Case Summary (BLD)  5/26/2017 DONE
DetailsBrian McGowan
Inspection Record Card- Bld  5/26/2017 DONE
DetailsBrian McGowan
PLANS/APPL TAKEN TO FRONT DESK  5/26/2017 DONE
DetailsBrian McGowan
Permit Ready to Issue  5/26/2017 DONE
Issue PAID IN FULL permit  5/26/2017 DONE
Application received 5/26/2017