Second Notice | | 7/21/2018 | 8/7/2018 | | DONE |
|
|
|
mailed 8-10-18
|
First Notice | | 7/2/2018 | 7/11/2018 | | DONE |
|
|
|
mailed 7-12-18
|
Permanent Occupancy | | | 6/22/2018 | | DONE |
|
|
|
|
BLD-Final | 6/20/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD-Final | 6/5/2018 | 6/7/2018 | 6/7/2018 | A | PART |
Jim Sly
|
|
|
Steve Phone #: ###-#### Temp OK.
|
FIRE-Final Inspection | 6/5/2018 | 6/6/2018 | 6/6/2018 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given until the permanant building designations have been mounted (A, B, C...ect.). The west most fire hydrant is being rotated per the fie captain.
Steve Phone #: ###-####
|
PubWorks Occupancy Approval | 6/6/2018 | 6/6/2018 | 6/6/2018 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 6/1/2018 | 6/4/2018 | 6/4/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)
Steve Phone #: ###-####
|
BLD-Final | 5/23/2018 | 5/30/2018 | 5/30/2018 | A | NR |
Jim Sly
|
|
|
Please call ahead for access - Steve Phone #: ###-####
|
Zoning Approval | 5/30/2018 | 5/30/2018 | 5/30/2018 | | PASS |
Sarah Schafer
|
|
|
|
FIRE-Final Inspection | 5/23/2018 | 5/29/2018 | 5/29/2018 | A | FAIL |
Troy Cobbley
|
|
|
This was for a partial inspection. Contractor is missing all of the small documents/review comments. I went to the job site twice before I was able to make contact. I noted that the fire dept access (20'-0") has not been met in many locations especially at the south end of the project site, there are possible turning radius issues in the same location. Non of the fire hydrants meet the minimum 3'-0" clearance rule, non of the building have the A, B, C designations, the main gate does not meet the 20' min. clearance and the opticon has not been installed/tested, there is a gate just in side the entrance on the right that does not meet the 20' min. clearance., no fire extinguishers have been installed in the storage areas, building address appears to be partialy blocked. Due to time constraints I was unable to test the exit signs/emergency lights/exit discharge lights for the storage buildings with interior corridors. Single action hardware needs to be installed on the office doors as discussed and exit signs/emergency lights/exit discharge lights are missing from the office. I spoke to both Ron and Adele and it appears a plan modification will be required showing the changes to the fire access lane widths/possible radius changes especially the large changes at the south end of the project
Please call ahead for access - Steve Phone #: ###-####
|
Meeting | | | 4/27/2018 | | DONE |
|
|
|
Per attached email from K Reed - name updated to add DBA
|
BLD-Framing/Rough-in | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PART |
Mike Jordan
|
|
|
Ken Phone #: ###-####. Interior steel stud framed walls ok and soffitt. Need the structural drawings for exterior bearing walls and roof prior to cover.
|
BLD-Foundation | 11/13/2017 | 11/14/2017 | 11/14/2017 | P | NR |
Jim Sly
|
|
|
Dane Phone #: ###-####
|
Print Occupancy Form | | | 9/22/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/22/2017 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/22/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 9/20/2017 | | |
|
|
|
|
Plan assigned to (JG) | 6/21/2017 | 6/21/2017 | 9/20/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 7/12 Cole Storage BLDG OFFICE ***EPLAN***
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/20/2017 | | DONE |
Christina Prado
|
|
|
ALL MET Need:GC Form
Revised Certificate of Value
RP-MET
DO NOT ISSUE WITH BLD17-01937, BLD17-02006 through 02018
|
Routing - PLAN CHECK | 9/11/2017 | | 9/20/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 9/11/2017 | 9/11/2017 | 9/19/2017 | | PASS |
Scott Arellano
|
|
|
Review comments attached to case
|
Routing Off Site - STRUCTURAL | 9/11/2017 | | 9/16/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineers Chris Holladay
|
Routing PW Drainage | 9/11/2017 | | 9/16/2017 | | PASS |
Brian Murphy
|
|
|
signed off in ePlan by PW Drainage Brian Murphy
|
Routing PW Street Lights | 9/11/2017 | | 9/15/2017 | | PASS |
Tom Marshall
|
|
|
Please remember to sign off on all remaining 13 permits
|
Route to Impact Fee Review | 7/19/2017 | 7/22/2017 | 7/21/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
1st review completed | | | 7/19/2017 | | DONE |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 6/21/2017 | | 7/19/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Street Lights | 6/21/2017 | | 7/17/2017 | | FAIL |
Tom Marshall
|
|
|
Failed in ePlan by Street Lights Tom Marshall
|
Routing Off Site - STRUCTURAL | 6/21/2017 | | 7/17/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Chris Holladay
|
Routing - PLANNING Land Div | 6/21/2017 | | 7/13/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLANNING | 6/21/2017 | | 7/13/2017 | | PASS |
Leon Letson
|
|
|
|
Routing - Design Review | 6/21/2017 | | 7/10/2017 | | PASS |
Sarah Schafer
|
|
|
|
Routing PW Drainage | 6/21/2017 | | 6/30/2017 | | FAIL |
Brian Murphy
|
|
|
NEED CANAL OK.
|
Routing - PLUMBING | 6/21/2017 | | 6/26/2017 | | PASS |
Bill VanDegrift
|
|
|
|
Routing PW Solid Waste | 6/21/2017 | | 6/23/2017 | | PASS |
|
|
|
Project approved for commercial cart service.
|
Routing - MECHANICAL | 6/21/2017 | | 6/22/2017 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 6/21/2017 | 6/21/2017 | 6/21/2017 | | FAIL |
Scott Arellano
|
|
|
Report attached to case and emailed to architect.
|
Routing - Erosion and Sediment | 6/21/2017 | | 6/21/2017 | | PASS |
Melissa Jannusch
|
|
|
Plan approved. RP TBD
|
Routing - PUBLIC WORKS | 6/21/2017 | | 6/21/2017 | | PASS |
Rachael Beierle
|
|
|
CONTACT WEST BOISE SEWER DISTRICT FOR PERMIT PRIOR TO CONSTRUCTION.
|
Routing - Addressing | 6/21/2017 | | 6/21/2017 | | PASS |
Laura Hunter
|
|
|
Address corrected to 7455 W Swift Ln per change of address on 5/26/17
|
Intake Approval | | | 6/21/2017 | | PASS |
|
|
|
|
Intake Approval | | | 6/16/2017 | | FAIL |
Julie Romig
|
|
|
1. 502 Application for each building with building area, occupant load, and value specific to each building.
2. Sheet C6 ESC plans indicated on checklist and Civil sheet index, but not uploaded. Please upload sheet in Drawing Folder.
|
Application received | | | 6/14/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 14 2017 7:19AM
|