Second Notice | | 7/21/2018 | 8/7/2018 | | DONE |
|
|
|
mailed 8-10-18
|
First Notice | | 7/2/2018 | 7/11/2018 | | DONE |
|
|
|
mailed 7-12-18
|
Permanent Occupancy | | | 6/22/2018 | | DONE |
|
|
|
|
BLD-Final | 6/20/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Jim Sly
|
|
|
Steve Phone #: ###-####
|
FIRE-Final Inspection | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Per the contractor the new inner gate, at the main gate, is also connected to the opticon system.
Steve Phone #: ###-####
|
BLD-Final | 6/5/2018 | 6/7/2018 | 6/7/2018 | A | PART |
Jim Sly
|
|
|
Steve Phone #: ###-#### Temp. OK.
|
FIRE-Final Inspection | 6/5/2018 | 6/6/2018 | 6/6/2018 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy is being given until the permanant building designations have been mounted (A, B, C...ect.). The west most fire hydrant is being rotated per the fie captain.
Steve Phone #: ###-####
|
PubWorks Occupancy Approval | 6/6/2018 | 6/6/2018 | 6/6/2018 | | DONE |
Tiffany Lowery
|
|
|
|
FIRE-Final Inspection | 6/1/2018 | 6/4/2018 | 6/4/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need the exit discharge, on the east Office building door repaired and provided with a secondary power source, Repair the exit sign/emergency light/exit discharge light in the west corridor of BLDG K, Provide testing of the Opticon system at the main gate. get fire dept approval for the west side fire hydrant (barrel points to bollard)
Steve Phone #: ###-####
|
FIRE-Final Inspection | 5/29/2018 | 5/30/2018 | 5/30/2018 | A | FAIL |
Troy Cobbley
|
|
|
exit signs/emergency lights/exit discharge lights passed. Fire extinguishers passed. Can not sign off until the fire lane, fire hydrant..ect items have been corrected.
Steve Phone #: ###-####
|
BLD-Final | 5/23/2018 | 5/30/2018 | 5/30/2018 | A | NR |
Jim Sly
|
|
|
Please call ahead for access - Steve Phone #: ###-####
|
Zoning Approval | 5/30/2018 | 5/30/2018 | 5/30/2018 | | PASS |
Sarah Schafer
|
|
|
|
FIRE-Final Inspection | 5/23/2018 | 5/29/2018 | 5/29/2018 | A | FAIL |
Troy Cobbley
|
|
|
This was for a partial inspection. Contractor is missing all of the small documents/review comments. I went to the job site twice before I was able to make contact. I noted that the fire dept access (20'-0") has not been met in many locations especially at the south end of the project site, there are possible turning radius issues in the same location. Non of the fire hydrants meet the minimum 3'-0" clearance rule, non of the building have the A, B, C designations, the main gate does not meet the 20' min. clearance and the opticon has not been installed/tested, there is a gate just in side the entrance on the right that does not meet the 20' min. clearance., no fire extinguishers have been installed in the storage areas, building address appears to be partialy blocked. Due to time constraints I was unable to test the exit signs/emergency lights/exit discharge lights for the storage buildings with interior corridors. Single action hardware needs to be installed on the office doors as discussed and exit signs/emergency lights/exit discharge lights are missing from the office. I spoke to both Ron and Adele and it appears a plan modification will be required showing the changes to the fire access lane widths/possible radius changes especially the large changes at the south end of the project
Please call ahead for access - Steve Phone #: ###-####
|
Meeting | | | 4/27/2018 | | DONE |
|
|
|
Per attached email from K Reed - name updated to add DBA
|
Issue PAID IN FULL permit | | | 9/22/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/22/2017 | | DONE |
|
|
|
|
Plan assigned to (JG) | 6/21/2017 | 6/21/2017 | 9/20/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 7/12 Cole Storage BLDG G
|
Permit Ready to Issue | | | 9/20/2017 | | DONE |
Christina Prado
|
|
|
ALL MET
Need:
GC Form
Revised Certificate of Value
DO NOT ISSUE WITH BLD17-01937, BLD17-02006 through 02018
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2017 | | DONE |
|
|
|
|
Routing - FIRE | 9/16/2017 | 9/16/2017 | 9/19/2017 | | PASS |
Scott Arellano
|
|
|
IFC Review comments attached to BLD17-01937
|
Routing Off Site - STRUCTURAL | 9/16/2017 | | 9/16/2017 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan by AHJ Engineer Chris Holliday
|
Routing PW Drainage | 9/16/2017 | | 9/16/2017 | | PASS |
Brian Murphy
|
|
|
signed off in ePlan by PW Drainage Brian Murphy
|
Route to Impact Fee Review | 7/19/2017 | 7/22/2017 | 7/21/2017 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Routing Off Site - STRUCTURAL | 6/21/2017 | | 7/19/2017 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Chris Holladay
|
Routing PW Drainage | 6/21/2017 | | 7/19/2017 | | FAIL |
Brian Murphy
|
|
|
failed in ePlan by BGM
|
Routing - PLAN CHECK | 6/21/2017 | | 7/19/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 6/21/2017 | | 7/19/2017 | | PASS |
Troy James
|
|
|
no mech in bldg G
|
Routing - Erosion and Sediment | 6/21/2017 | | 7/19/2017 | | PASS |
Andy J. Long
|
|
|
signed of in ePlan by MMJ
|
1st review completed | | | 7/19/2017 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLANNING | 6/21/2017 | | 7/13/2017 | | PASS |
Leon Letson
|
|
|
|
Routing - PLANNING Land Div | 6/21/2017 | | 7/13/2017 | | PASS |
Todd Tucker
|
|
|
|
Routing - Design Review | 6/21/2017 | | 7/10/2017 | | PASS |
Sarah Schafer
|
|
|
|
Routing - PLUMBING | 6/21/2017 | | 6/26/2017 | | PASS |
Bill VanDegrift
|
|
|
|
Routing - FIRE | 6/21/2017 | 6/21/2017 | 6/21/2017 | | FAIL |
Scott Arellano
|
|
|
Report attached to BLD17-01937 and emailed to architect
|
Routing - PUBLIC WORKS | 6/21/2017 | | 6/21/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 6/21/2017 | | 6/21/2017 | | PASS |
Laura Hunter
|
|
|
Address corrected to 7455 W Swift Ln per change of address on 5/26/17
|
Intake Approval | | | 6/21/2017 | | |
|
|
|
|
Application received | | 6/20/2017 | | | |
|
|
|
|
Application received | | 6/20/2017 | | | |
|
|
|
|